Definitions


Definitions:

Kids: Alissa, our daughter; Nick, our son-in-law Baby: Molly Kathleen, our granddaughter *after 2/8/17 Connor Daniel, our grandson Kaya: The Kids' Rhodesian Ridgeback
Up North: Our home in Walnut Creek, CA Down South: Our new home in Ventura, CA

Tuesday, February 9, 2016

Kitchen Remodel - Day 26 to 37 January 28th to February 8th.

Thursday, January 28th
Another trip to Lowe's.  Now that Home Depot doesn't give us the "Lowe's discount" when using the Home Depot card, we're using Lowe's more often.  Bought more wire.

I went to my applique group in the morning.  I so enjoy being around other quilters once a week.  The guild meeting here is during the day which I find hard to get used to.

Bruce worked on electrical all day.

Friday, January 29th

I babysat Molly in the morning at their house while the kids went to a teacher parent meeting.  It was nice to have just some one on one time with Miss Molly.

Bruce continued to work on the electrical.  Don't think most people realize how much wire runs through their walls.

The kids treated us to a night at the Aloha Steakhouse for our 45th wedding anniversary. Can you believe it's been that long?   Looking back I realize what a wonderful life it's been together.  If fate hadn't landed us at the same place at the same time all those many years ago...well I just can't imagine any other life.

Saturday, January 30th

Back to Lowe's for more wire, outlets, covers and miscellaneous electrical supplies.  We should buy stock!  Stopped at the kids and borrowed Nick's nailer.  How much faster does that make the work!

Bruce got some of the bracing in between the rafters.  

Sunday, January 31st

Bruce finished putting up the bracing, then stapled up the insulation.  Will help keep the house warmer.  

I worked on my 3 quilt patterns that I still hope to publish.  Got the layouts all set up the same.  After the kitchen is finished I'm hoping Bruce will give his stamp of approval so I can pass them along to Alissa.  There are still several people out there that keep asking me when they can buy my patterns.

Monday, February 1st

Bad at the ranch.  Bruce cut the hole for one of the pendants off by 1/2".  A trip to Lowe's for a smaller electrical box we're hoping will solve the problem rather than patching.  He continued working on electrical.  Told you, you'd be amazed about the amount of wiring it takes.

Tuesday, February 2nd

Yes, more electrical.  Got all the boxes (though these are round) in for the pendant lights.

Wednesday, February 3rd

Yes, more electrical.  Think he's finished with all the wires up in the attic now.  If you've been following us for awhile, you'll remember last May the transformer blew up on the power pole a few doors down, blowing our electrical meter completely off the side of the house. Anyway, when the electricians came to put in a new circuit panel and meter they had to go up in the attic.  They were very impressed with Bruce's electrical work.  He didn't tell him he had done it.  

Cut the upper corner of the entry wall away.   Our eating counter will open up at that point.  It will let in more light to that side of the kitchen.

Thursday, February 4th

I got the morning off to go to my applique group.  My favorite day of the week.

Bruce went to Home Depot to buy more studs for the peninsula and some insulation for the walls.

Peninsula wall built
The top of the peninsula wall needed to be notched in 5 places for brackets to support the eating counter.  Took him hours to do it the 5 2" notches one slice at a time on the radial arm saw.  Brought it in the house and realized he had done the notches on the wrong edge of the wood. To quote him: "#$%%^$$*# ".

Friday, February 5th

Installed the outside lights timer in the wall socket in the entry.  I got the job of reading all the instructions and got it set up.

Bruce got the blocking in at the corner where he removed the upper half of the wall.  

I cut the insulation tubing and got all the hot water pipes covered except the few around the drain pipe...which has to be replaced first.

We had a nice dinner out with the kids and Molly at Wood Ranch.  Yummy BBQ baby back ribs!

Saturday, February 6th

Bruce re-cut the top board for the peninsula wall.  This time with no $%#^.  He got the wall built and the electrical boxes put in.  The wall is just leaning against another wall for the time being.  He has to finish building out the notched wall to attach the peninsula wall to it.  He may not put it in until we have cabinets to help support it.  Not sure.

We took a field trip to a flooring place downtown.  Saw a number of tiles that I like.  Still feel we need to settle on a counter top before choosing the flooring.  Though we're going to go with a light beige, neutrally color.

Sunday, February 7th

Just did odds and ends in the morning.  It's SUPER BOWL Sunday after all!  Congrats to Peyton Manning for his 200th win.

Monday, February 8th

We have ceiling!
Bruce and I went and bought sheet rock for the ceiling and joint compound.  Nick came over and the two of them got the ceiling up.  YEA!  It's rebuilding time!

After lunch with the kids, we got the ceiling marked for the lights.

Thursday, February 9th


I went to the guild meeting this morning while Bruce got the recessed lights in the kitchen. We have these throughout the house and they are the greatest lights.  LEDs that use very little energy to run and give off a nice light.  Bruce likes them so much he emailed the company to tell them.  That doesn't happen very often.  There are 8 lights altogether (not all show in this picture).  The blue circles are the boxes for pendant lights over the eating counter.  Bruce set up the 6 task lights around the counter on one switch, the two center lights on a switch and the pendants on a third switch.  That way if we're just going in to grab a drink we can just turn on 2 lights and not all of them.  It's gonna be nice folks!





























Wednesday, January 27, 2016

Kitchen Remodel Day 18 to 25, Wednesday 27th

We're still alive.... though some days we're not so sure we'll make it.  We both are still coughing up a storm; but working through it.

Thursday 21

Bruce and I got the rest of the sheet rock off the walls.  Took another load to the dump.

Friday 22

Took my car down for an oil change and to fix the front end noise.  It's amazing how a $30 oil change can end up costing close to $900.  They kept the car over night.

Bruce had to go down and fix our tenant's garage door.  It had lost a nut and was off it's runners.  Didn't take long to fix.

He spent the rest of the day in the attic scrapping the loose insulation off the kitchen ceiling.  Glad we bought him a good respirator.  

Also got the brackets ordered for the eating counter.

Saturday 23

Bruce cut out an 18" strip of wood flooring from the dining area.  I spent the day scrapping up the adhesive with a scrapper and a chisel.  It was a lot faster and easier than the tile flooring.  We still need to go back and sand down the black adhesive from the tiled area.

Bruce also mapped out the electrical and started attaching blue boxes to the studs.





Sunday 24

Today would have been my sister's 80th birthday.

We took down the dropped ceiling.  What a mess.  Took down some of the frame work for it. Loaded up the truck for another trip to the dump.  Unfortunately, the dump down here isn't open on Sunday's like it is in the Bay Area.  

Monday 25

Took the load to the dump.  Then went to Home Depot and got some rolled insulation. Figured we'd lay it across the attic joist to help keep the house warmer.  Turned out the weather has warmed a bit so we haven't put it up yet.

Went to Lowe's to have some black pipe cut and threaded.  Took us over 1/2 hour to get someone to help us.  Then it took another 1/2 hour to get it down and checked out.

Tuesday 26

1 New Black pipe down to HW Heater
Nick came over and help Bruce get the gas pipes in.  Only one pipe was miscut sending Bruce back to Lowe's for another piece.  They worked all day at it.   Nick also helped get the rest of the frame work down from the ceiling.  Bruce was so grateful for his help.  I know he was so worried about this part of the process; hoping it will settle his stomach a bit now that it's done.

3 BP down to Stove
Plumbing for ice maker
2 BP to dryer in garage
Bruce got a lot of the old wiring pulled out.  Some of it was for the old alarm system that was removed before we bought the house.  They just snipped the wires and left them in the attic.









Lowered ceiling framing removed
I joined to the girls for a trip to Joann's then went on to Kohl's for a little shopping.

Lowered ceiling framing removed




Wednesday 27

Today was an easy day.  Went to Costco and them to Home Depot for wood for the ceiling.
A much needed day of rest.  Bruce is on the patio as I'm writing this working on Suduko puzzles enjoying a little sunshine.  We'll be heading over to the kids at 3 to babysit so they can go to a movie and have dinner. 


Wednesday, January 20, 2016

Kitchen Remodel - Day 13 to 17, Wednesday 20th

Cough, cough, cough.  Chills, fever, chills.  What a week.  Between the two of us we feel like death warmed over.  

But through it all we've managed to keep working a bit each day.


Monday saw the last of the flooring go.  I was bound and determined to get through it all. Except for an hour from each Bruce and Nick I managed to get it all done.  Still have to get some of the black adhesive off.  Bruce thinks a sander will work on that.  Only have one bruise to show for the whole thing.  The plain concrete is where the old cabinets were. The black is the adhesive on the floor. Still haven't figured out the spray painted area on the walls behind the cabinets.
  


Plumbing sculpture
Bruce had one leak in the plumbing; of course it was the worse possible area to repair.  I have a nice copper sculpture on my desk of the part he had to remove and redo.  But for the most part the plumbing is finished.  Drywall is up in the garage.  Washer and dryer are both hooked up and working.  Needing clean clothes is always a motivator.

Today, Wednesday 20th, we put up the temporary walls to enclose the kitchen.  Hoping that this will cut down the dust throughout the rest of the house.  Going to make getting in and out a challenge but will be well worth it.  Tomorrow we can start removing the rest of the sheet rock.  Bruce still needs to get the loose insulation cleared in the attic so we can open up the ceiling.  
2 wall from front door

1 start of temp walls
3 inside kitchen towards garage door
4 Inside look from living room across to sewing room


5 Outside corridor from sewing to livingroom





Friday, January 15, 2016

Kitchen Remodel - Day 10, 11, 12 - Wednesday, Thursday and Friday 15th

Had to go back and rewrite a few sentences on the last post.  I'm going to chalk my poor grammar to running a fever while I was writing.

Wednesday, January 13th


Went to the doctor.  Have a sinus infection.   Explains the fever but not the cough.  Now that I'm using the nasal spray my sinus have opened flood gates.  Rather have the fever and sleep.

Bruce made several trips to Home Depot including a late night run out to Camarillo and still couldn't find the right plumbing parts.  Of course the website says they have them.

Thursday, January 14th

Started chiseling on the floor again.  Made it all the way around the outside.  Stopped using the multi-tool because Bruce is afraid I'll burn out the motor.  All this hammering on the cement is not helping my headache.

We made another run to Home Depot.  This time to get 3 sheets of drywall.   Nick has a class tomorrow but is available on Sat and Sun to help get the Hot Water Heater out of the corner.

Friday, January 15th


Jog inn Wall
The plumbing in the garage is still giving him nightmares.  Adding that second filter just for the kitchen is the cause for all the trouble.  He had gotten some pipes in and realized they were going to be outside sheet rock.  Turns out there's a "jog" in the garage wall right past where the kitchen starts.  The picture to the left show the "jog" in the foundation.  The area of multi studs is the corner where the front of the house starts.  The big round dryer vent pipe is on our front porch. To the right of the multi studs is the kitchen.  


He needs to have all the new pipes in and ready to hook up tomorrow after Nick helps him get the Hot Water Heater out.  Hopefully, everything will hook up OK and we can get the sheet rock up in the corner.  It needs to be painted with at least one coat of primer to be up to code.  If we can get that all done tomorrow, we'll have hot water tomorrow night. Otherwise, it's showers at the kids and hopefully fixed on Sunday.  I remember a time when I could help lift things with Bruce.  Not so much anymore.


The metal recyclers came by today.  Got rid of all the old appliances and other metal debris. Gives us more room in the garage.  Plus no dump fees.

I moved all the boxes I had packed up from the dining area to under Annabelle.  She and they are all covered in plastic.  Here's also a picture of our make shift kitchen on my cutting table.  Don't think I'll be doing much sewing the next few months.

Still whittling away at the floor.  Most of it's coming up in just 1" hunks or smaller.   Been watching a lot of videos on YouTube and there's just no easy way.  Seems we'll need to pour boiling water on the adhesive and let it loosen then scrape it off.  Not looking forward to that process.


Tuesday, January 12, 2016

Kitchen Remodel Day 7, 8 & 9, Sunday/Monday/Tuesday

Sunday, January 10th

Emptied the rest of the kitchen cabinets and drawers.  Set up our make-shift kitchen on my cutting table in the sewing room.  

Got the sink out and opened the sheet rock behind it.  YUK.  I am so looking forward to knowing all the plumbing is new and done right.


I worked on taking all the medal runners off the drawers and cabinet pull-outs.  Then knocking the crap out of them till they came apart.  Felt so good.  We thought we were going to need a dumpster, but with everything getting broken down, should only take 3 truck fulls to the dump.

The kids came over after lunch and to help take down the cabinets that hung down over the peninsula.  It's amazing how it opens up the kitchen.  

Bruce reconnected the washer and dryer so I'm doing laundry tonight.  Then he can have at it with the plumbing.  

Monday, January 11th

We loaded up the truck with all the debris from the cabinets. Saving out the metal runners and pipes for the metal recyclers.  

I worked on the flooring again.  Found using the multitool with the scrapper blade works well. Just have to let it rest every so often so it doesn't over heat.

After lunch I started having chills and discovered I had a 101.2 fever.  Went to bed while Bruce worked on plumbing.

Tuesday, January 12th.

Still running a fever.  Really bums me out I'm missing out on more of the demo.  Want to get back to chiseling out the flooring. 

Nick came over and they got the rest of the upper cabinets down and the lowers out.  Pulled out Chamber's cook top.  It's a classic, but not in any condition to resell.  Have no clue what the brown areas on the wall are.  I know the previous owners were heavy smokers, but the cabinets were there.  Unless the the original kitchen just had shelves.  Who knows.

Bruce took apart the remaining cabinets and filled another truck load for the dump.  It's amazing how large the kitchen looks with nothing in it.  Hoping the cabinets and layout we've chosen will still make it look big.
 
Below is a picture showing two of the last flooring.  There's a third under the red.  It's the hardest to remove because of the adhesive they used to glue it to the cement slab.






Saturday, January 9, 2016

Kitchen Remodel Day 4,5,6 - Thurs/Friday/Sat

Yet another trip out to Home Depot.  We should have stock in their company.  Bought a laundry tub for the garage.  It will give us a place to wash up plaster and paint rather than in the bathroom sink.  


Bruce spent most of the day working on the water pipes.  Mapping out how to get the pipes in the right order and past one another.  When you have a whole house filter and water softener and it still doesn't make the water taste good what do you do?  You add another water filter.  This one is a carbon base like the Brita I use now for drinking water.  Bruce is tied of it in the refrigerator and I refuse to give Molly water out of the tap or make tea with tap water.  And since we'll finally be able to hook up the ice maker, I want the ice cubes to taste good too.  He's got to find a route to add the new carbon filter into the cold water line after the whole house filter and softener that goes into the kitchen sink and refrigerator.  

From the look of what was done in the past and other homes we've seen, people just don't think a thing about routing their water pipe around in circles to get to where they want to go. Not realizing that every turn reduces your water pressure.  Not only that but taking the long way around on your hot water wastes water trying to get the hot water through all the pipes. When we do the bathroom and add the laundry room, we'll be putting in a second hot water heater for those rooms and the guest bath.  Probably will take the large one from the garage and move it back there and replace the one in the garage to a smaller one that will just go to the kitchen.  So looking forward to that.  But that's years away unfortunately.

We had Molly from lunch time through dinner on Thursday.  She is so much fun.  Exhausting at times, but fun.  I'm constantly amazed at her vocabulary.  Wish I could remember what she said last night.  But she stopped mid story and you could see her little brain working then she used a word that totally surprised me.  Not just the word, but that she used it correctly.  Wish my brain was still as sharp as hers. :)

Today, Friday 8th, Ronni and Jim from the Kitchen Place came out to measure the walls. Apparently, Jim has to measure and make sure that our measurements and her cabinet layout will all fit.  Glad they double check everything before sending in the order.  All was good.

Saturday, 9th

Started with a trip to Nick's to borrow an extra battery charger and a second for an drill extension.  Ended up having to go to Lowe's for another extension and miscellaneous tools and more copper fittings.

Bruce got the hot and cold water copper pipes in from the garage to the sink.  They aren't attached yet since we're still using the old sink and haven't disconnected the existing lines.  If you only see one old line that's because the hot water is still connected under the slab.  The cold must have leaked at one point and that's when they put it through the cabinets.  

As I was vacuuming up all the drilling debris I noticed several layers of linoleum.  We knew the top layer was put on when the Fanny Mae people tried to make the house look good because it was in both bathrooms too.   This is several hours later; turns out there are 4 layers. The bottom one is glued to the slab.  I've been chiseling it off. Very slow going.  That little area of black you see filled up the 5 gallon bucket before I emptied it.  The area is only 36" by 36".  Have a long way to go!

Meanwhile back in the garage Bruce has changed out one gas line.  All went well and he got all the pilot lights back on.  Hoping now he won't be as worried about the other changes he needs to make.  He also go a lot of the copper water pipes reworked.  Because we're still using the kitchen, he can only get the pipes in the walls but not hooked up.  

He's adding a laundry tub and a second filter.  Think I told you that already.  Sorry if I repeat myself.  I'll try to read back; but tonight I'm too tired.

















Wednesday, January 6, 2016

Kitchen Remodel Day 2 and 3

Tuesday, January 5, 2016

Ordered our cabinets.  Brookhaven, shaker style in a Mocha.  Don't know why they call it Mocha when it's a deep pecan red.  All I know is I like it.  Also got the sink ordered from the plumbing shop.

Spent a lot of time going from store to store to store looking for the right parts.  They sell you a Filter System but not the parts you need to get it hooked up!!

Dishwasher got pulled out.  Drain pipe elbow looks like its made out of duct tape.  Until we decide to go into full demo mode, we're not messing with it.  Once the water gets turned off to the kitchen and the sink removed, then we'll see what we have there.

Mud Sill
Bruce got the mud sill in the hole where the oven cabinet had been.  They had cut it out. The cabinet looked like (if you look at yesterday's pictures) it was sitting on a pallet.  I thought they had stuffed plastic bags in there for some reason.  Actually it was a rat's nest.  Bruce was kind enough not to show me.  It had been vacant for some time.  YUK.

Wednesday, January 6, 2016

Drain pipe-Kitchen and washer
Water pipe inside cabinet
Bruce pulled out the cabinet next to where the dishwasher was.  OMG.  Got a good view of the drain pipe where it goes into the slab.  Got a good view of the outside too unfortunately. They cut out the mud sill where the drain pipe comes up from the slab, and left it as it.  From the outside you can't see anything because the siding hangs down over the mud sill.  But from the inside we can see day light coming through.  There was evidence of rat droppings under the cabinet.  Bruce filled the area with cement.

Drainpipe closeup

In the meantime there has been a thunder storm going on outside.  It's suppose to let up tomorrow and Friday and then hit us again Saturday.   Our back yard was underwater. Wish I had a picture of Bruce on the ladder peering over the fence.  Water back there was up to the first run of the ladder.   Not knocking the rain; heaven knows we need it. Just wish it would come in smaller doses over a longer period of time.  At least the water has drained off now.  There's a 6 foot drop to the neighbor's yard behind us.  That's their second story windows you see.  The left side of the house was flooded too.