Definitions


Definitions:

Kids: Alissa, our daughter; Nick, our son-in-law Baby: Molly Kathleen, our granddaughter *after 2/8/17 Connor Daniel, our grandson Kaya: The Kids' Rhodesian Ridgeback
Up North: Our home in Walnut Creek, CA Down South: Our new home in Ventura, CA

Friday, February 19, 2016

Kitchen Remodel - Day 38 to 48, February 9th to 19th

Wednesday,February 10th

Had to make several trips to several different hardware stores.  For some reason it's hard to find the right configuration needed.  Bruce is getting frustrated and I don't blame him.

Thursday, February 11th

I had a nice break (not that I need one) to go to my Thursday morning applique group.

behind sink
Bruce got the drain pipe in.  He reconfigured the pipe that goes into the garage for the washer, sink and water softener with all new pipes.  




garage sink with softener drainpipe

Friday, February 12th

Had to make 2 trips to Home Depot for sink connectors for the garage wash tub sink.  The ones that came with the sick were only 6" long; pretty useless.  But Bruce got the right ones finally and got the sink hooked up.  Yea, no more washing paint brushes, etc in the kitchen sink!

Had a nice dinner at the kids house.  BBQ'd hamburgers and mac and cheese.  My kind of meal!  Did you know that was our wedding night dinner?  Yea, some little hamburger joint on the road going up to Tahoe.  Makes me smile just remember what fun we had.

Saturday, February 13th

Took the girls to breakfast.  

Bruce got more blocking up between the studs.  Wants to make sure that there's solid place to secure the cabinets.  He got most of the insulation in the two exterior walls.   One of those is the garage wall.


I got to enjoy the day with the girls.  We went shopping for goodies.  Made cut out cookies in the shape of hearts, stars and flowers.  Got them all decorated for gifts.  Such fun.

Sunday, February 14th  Happy Valentine's Day!

Bruce took the day off.....well from working on the kitchen.  He programmed all day.

Took the girls to Sharky's Mexican food for lunch.  One of Molly's favorites.  That and Red Robin.  I think they are only her favorites cause it's where we take her the most.

Monday, February 15th

Finished insulating the walls.  You know Bruce does a lot more than I end up writing about. There are so many little things that have to be tweaked or done that I don't see or forget to write down.  Light the lights falling out of the ceiling because of the hammering.  They are pushed all the way in because we need to take them out to paint.  I think he finally took all but the two center ones out completely and went back to using work lights.

Went to Home Depot for sheet rock for the walls.  While I stood in line to return left over insulation, he loaded 12 sheets on a cart.  After we paid for them I waited while he got the truck.  The "loader" was there helping someone else; as soon as he was finished he looked and me and the sheet rock, the next thing I knew he was no where to be found.  I helped Bruce load the truck.  At home he carried them all in the house and I just helped stack them on the floor.  Needless to say he was exhausted at the end of the day.  That stuff is heavy!

Have you noticed how clean the site is?  Bruce vacuums and cleans up every day.  He can't stand messes.  My sewing room drives him crazy. :)

Tuesday, February 16th

Bruce got the "pony" wall up.  Don't know why he calls it that.  It's the half wall for the peninsula and eating counter.  Got the brackets in.  Had an old shelf to put on top of the brackets so no one runs into them.


The end wall got built.  We designed it so that the entry wall is cut back (and built out at the bottom) at the top where the end of the eating counter is located.

Wednesday, February 17th

Bruce got the grass cut.  Suppose to rain tomorrow.

I babysat over at Molly's in the afternoon.  Nick is at a "Ropes" class all this week.  

The garage wall got sheet rocked.  Bruce is only putting in enough screws to hold it in place; he'll go back later and add more screws.  It's a very tiring process.  (More so when you're 66)

Thursday, February 18th 

I escaped again to my applique group in the morning.  I "built" the second tower of the Golden Gate Bridge. :)

Meanwhile, Bruce got the peninsula and entry walls and part of the exterior wall sheet rocked.  When I got home he handed me the multi-tool to cut out the notches for the brackets on the dining room side of the peninsula wall.  You can do a lot of damage with that thing!

Friday, February 19th

That little black triangle is the drainpipe
Got the sheet rock on the exterior wall finished.  The drain pipe going into the slab is not centered so it sticks out pass the studs.  It's no wonder the old one was jerry-rigged with duct tape.  So that had to be cut around.  He finished up all the odd on end pieces of sheet rock. Like the around the corner.  Forgot that the entry wall has "orange peel" texture on it.  Our new little lower wall has to be matched to it. Either that or Bruce will have to skim coat the rest of the entry wall with spackle to smooth it out to match the new all. Better look, but very messy to do because it all has to be done, sanded and re-done and sanded some more. That wall is open to my sewing room.
Entry corner of eating counter

Bruce also got the rest of the sheet rock screws in.  Took him till 5pm to finish up.

Wish this program would let me draw arrows to the pictures. :)   If you have forgotten or you can go back to December 2015 to see the rendering of what this all is suppose to look like when it's finished.






















Tuesday, February 9, 2016

Kitchen Remodel - Day 26 to 37 January 28th to February 8th.

Thursday, January 28th
Another trip to Lowe's.  Now that Home Depot doesn't give us the "Lowe's discount" when using the Home Depot card, we're using Lowe's more often.  Bought more wire.

I went to my applique group in the morning.  I so enjoy being around other quilters once a week.  The guild meeting here is during the day which I find hard to get used to.

Bruce worked on electrical all day.

Friday, January 29th

I babysat Molly in the morning at their house while the kids went to a teacher parent meeting.  It was nice to have just some one on one time with Miss Molly.

Bruce continued to work on the electrical.  Don't think most people realize how much wire runs through their walls.

The kids treated us to a night at the Aloha Steakhouse for our 45th wedding anniversary. Can you believe it's been that long?   Looking back I realize what a wonderful life it's been together.  If fate hadn't landed us at the same place at the same time all those many years ago...well I just can't imagine any other life.

Saturday, January 30th

Back to Lowe's for more wire, outlets, covers and miscellaneous electrical supplies.  We should buy stock!  Stopped at the kids and borrowed Nick's nailer.  How much faster does that make the work!

Bruce got some of the bracing in between the rafters.  

Sunday, January 31st

Bruce finished putting up the bracing, then stapled up the insulation.  Will help keep the house warmer.  

I worked on my 3 quilt patterns that I still hope to publish.  Got the layouts all set up the same.  After the kitchen is finished I'm hoping Bruce will give his stamp of approval so I can pass them along to Alissa.  There are still several people out there that keep asking me when they can buy my patterns.

Monday, February 1st

Bad at the ranch.  Bruce cut the hole for one of the pendants off by 1/2".  A trip to Lowe's for a smaller electrical box we're hoping will solve the problem rather than patching.  He continued working on electrical.  Told you, you'd be amazed about the amount of wiring it takes.

Tuesday, February 2nd

Yes, more electrical.  Got all the boxes (though these are round) in for the pendant lights.

Wednesday, February 3rd

Yes, more electrical.  Think he's finished with all the wires up in the attic now.  If you've been following us for awhile, you'll remember last May the transformer blew up on the power pole a few doors down, blowing our electrical meter completely off the side of the house. Anyway, when the electricians came to put in a new circuit panel and meter they had to go up in the attic.  They were very impressed with Bruce's electrical work.  He didn't tell him he had done it.  

Cut the upper corner of the entry wall away.   Our eating counter will open up at that point.  It will let in more light to that side of the kitchen.

Thursday, February 4th

I got the morning off to go to my applique group.  My favorite day of the week.

Bruce went to Home Depot to buy more studs for the peninsula and some insulation for the walls.

Peninsula wall built
The top of the peninsula wall needed to be notched in 5 places for brackets to support the eating counter.  Took him hours to do it the 5 2" notches one slice at a time on the radial arm saw.  Brought it in the house and realized he had done the notches on the wrong edge of the wood. To quote him: "#$%%^$$*# ".

Friday, February 5th

Installed the outside lights timer in the wall socket in the entry.  I got the job of reading all the instructions and got it set up.

Bruce got the blocking in at the corner where he removed the upper half of the wall.  

I cut the insulation tubing and got all the hot water pipes covered except the few around the drain pipe...which has to be replaced first.

We had a nice dinner out with the kids and Molly at Wood Ranch.  Yummy BBQ baby back ribs!

Saturday, February 6th

Bruce re-cut the top board for the peninsula wall.  This time with no $%#^.  He got the wall built and the electrical boxes put in.  The wall is just leaning against another wall for the time being.  He has to finish building out the notched wall to attach the peninsula wall to it.  He may not put it in until we have cabinets to help support it.  Not sure.

We took a field trip to a flooring place downtown.  Saw a number of tiles that I like.  Still feel we need to settle on a counter top before choosing the flooring.  Though we're going to go with a light beige, neutrally color.

Sunday, February 7th

Just did odds and ends in the morning.  It's SUPER BOWL Sunday after all!  Congrats to Peyton Manning for his 200th win.

Monday, February 8th

We have ceiling!
Bruce and I went and bought sheet rock for the ceiling and joint compound.  Nick came over and the two of them got the ceiling up.  YEA!  It's rebuilding time!

After lunch with the kids, we got the ceiling marked for the lights.

Thursday, February 9th


I went to the guild meeting this morning while Bruce got the recessed lights in the kitchen. We have these throughout the house and they are the greatest lights.  LEDs that use very little energy to run and give off a nice light.  Bruce likes them so much he emailed the company to tell them.  That doesn't happen very often.  There are 8 lights altogether (not all show in this picture).  The blue circles are the boxes for pendant lights over the eating counter.  Bruce set up the 6 task lights around the counter on one switch, the two center lights on a switch and the pendants on a third switch.  That way if we're just going in to grab a drink we can just turn on 2 lights and not all of them.  It's gonna be nice folks!