Definitions


Definitions:

Kids: Alissa, our daughter; Nick, our son-in-law Baby: Molly Kathleen, our granddaughter *after 2/8/17 Connor Daniel, our grandson Kaya: The Kids' Rhodesian Ridgeback
Up North: Our home in Walnut Creek, CA Down South: Our new home in Ventura, CA

Monday, April 30, 2018

April 2018

I see that the email notice you get for my blog shows the contents of the blog, but not in the nice way that the actual website shows it.  Think it's easier to read from the website than the email -FYI.

Side bricks rebuilt
Cement instead of bricks
Where to begin this month?  I think I told you the hardest part was going to be selecting the tile for the front of the fireplace.  I'm sure Bruce would disagree at this point.  Figuring out how to get the first 2 rows of bricks back in after they had fallen out was a real challenge.  But my genius husband always comes up with brilliant ideas.  He built a form and made it all out of cement.  Days have been spent getting the brick relaid around the front of the entire fireplace.  Almost finished....then a set back....more on that later.


Temporary opening to garage
Along the way, waiting for mortar to dry, he did get all the insulation in and most of the sheet rock back up.  If you recall, the door to the garage is on the "clean" side of our plastic wall.  He made an opening into the garage on the "work" side.   Well the plastic wall needs to be moved in order to close up the hole, plus to finish up sheet rocking the rest of the wall where new light switches are.  Then there's the ceiling taping and "mudding" to do. 



Door out to garage/lights for kitchen
One of the main reasons we didn't close off the entire room to begin with is that the kitchen lights are on the wall next to the garage door.  Once we move the wall we will no longer be able to turn on the kitchen lights without going out the front door, in through the outside garage door, back into the house on the work side of the plastic wall.  I say we just eat every meal out but I don't think that's a great solution.  Maybe just dinner...when it's dark in the kitchen. :)

While Bruce malls over how to handle this next step, he's helping Nick demo their guest bathroom.   Everyone down here seems to set the tiles in about an inch or two of cement.  Not making demo as easy as it should be.  Because of that, I'm wondering if I'll ever get our master bath done.  Anyway, they got most of it demoed the first day.  The tub was cast iron and a real bear to remove.  That was Sunday the 15th.  Nick went back to work on Monday and they were to start again on Tuesday the 17th.

I've begun writing this on April 18th, at 3am.  Yesterday (17th) we all had a busy day planned.  Lots of different appointments, juggling kids schedules and the rest of the demo.  Unfortunately, at 3am Bruce woke up with sharp pains in his abdomen.  At 6:30 I took him to the ER.  After a CT scan it was determined he had appendicitis.  There were only 2 of us in the ER waiting room when we got there, so we got a bed right away.  Within a few hours the place was so busy, his bed was moved to the hall way.  There were several ER surgeries ahead of him.  Since his appendix hadn't ruptured (thank goodness), he was low on priority.  Alissa came down to visit while he was waiting for surgery.  Fortunately, he was not in any pain.  The surgery was at 6:30 last night.  I waited until he was back to his room; couldn't go home without seeing him.  Surgery went fine and easy.  I was home at 10:15.  A very long day.

Needless to say, he won't be working on the bathroom or our family room for 6 weeks.  We had lots of time to talk yesterday.  His plan was to clean up the family room of all the work stuff, take down the wall and put the furniture back.  Start up again when he was able to work again.  His thinking was we'd have the dining room back (it's piled with furniture.) 

There's a few flaws in his plan.  Number 1 being that he can't move anything heavier than 5lbs.  Don't know how he thought he'd be moving and cleaning up.  I can do some of it.  But why, move all those bricks out and the furniture back when we will just need to move it all out again?  

I'll complete this at the end of the month and let you know where we are.

Here it is the end of April.  Tomorrow he goes to see the surgeon for his 2 week follow up.  Two week recovery seems to be enough for him...be interesting to hear what the doctor thinks!  

Right now he's scrapping the carpet glue off the floor in the family room.  The original flooring was linoleum tiles.  No need to take them up.  It was the same linoleum we ran into down at the other house.  He did take the plastic wall down but hasn't rebuilt one.  For the most part he's been taking it easy and it's driving him crazy.  He's expecting to get the "all clear" to get back to work tomorrow.  We'll see.

Meanwhile he's been over helping Nick as much as possible with their bathroom remodel. 

Here's a few pictures of a few of the Thomas Fire quilts I've made this month.  The mostly plain one (1) was a challenge from our Ventura Modern Quilt guild.  They had bagged (brown paper bag so we couldn't see) up fabric for each of us to take home and make something out of.  It was called the "Good, Bad and Ugly" challenge.  All fabric donated to the fire quilts.  My first attempt at a "modern" style quilt.  Quilt (2) was donated blocks.  Quilt (3) I took all the donated blocks that didn't measure 12 1/2 and added stripped blocks made out of the "Good, Bad and Ugly" fabric.  Think my only really "ugly" fabric was the blue one which is actually long horn cow heads.

Quilt 1

Quilt 2


I'm hoping to get the tables stacked behind my longarm moved so I can quilt the #1 quilt myself.  They need quilters more than piecers.






Quilt 3




Monday, April 2, 2018

March 2018 - Fireplace Removal Plus

Going to try to post at the end of each month.  

Our T-shirt
Don't think I finished up February. 


Pat(r) received my Quilt
I belong to the Ventura Modern Quilt Guild.  We're heading up the Thomas Fire Quilt Project.  Between January and February I made 2 Quilt tops, a dozen or so blocks and quilted 8 quilts for them.  The purple quilt is one I pieced over 20 years ago but never quilted.  I quilted feathers all over it and turned it in at the March meeting.  Later in this post you'll see I have to give myself a rest from using the longarm machine so have focused on making tops instead.  I know they need quilters more than piecers so am hoping to get back to quilting soon.  I put together blocks that one of my friends from DVQ (in Danville) had made.  Stephanie was fighting cancer the entire time that I knew her.  Each of us got a few of her UFO (UnFinished Objects) when she passed away.  Needed to make one more block to finish off this top.  Have another project that she only had pieces parts made.  Hoping to have it done by the April 9th meeting.   
Stephanie's Top
Selma came down for a week's visit.  She rode down on the Megabus which stops in Burbank.  Worked out great.  We spent the week doing hand sewing and going to quilt stores.  Took her to my small group on Thursday morning.  On Friday we drove to Pasadena to go to Quiltcon.  It was the farthest I've driven south since we moved here.  I have no problem making the trip up north but venturing down towards LA really bothers me.

Anyway we saw a great quilt show and had dinner with a lot of our DVQ friends from the bay area that had also come for the show.  Spent the night and came home Saturday morning.  

Unfortunately the week before my hands had swollen up.  Good news is that they were taking turns, left then right then left again.  The doctor had upped my inflammation meds but they weren't doing the job.

After Selma left I went to see the doctor who did blood work that indicated I had Rheumatoid arthritis.  (RA)  The Rheumatoid Factor is normally 14 or below, mine was 355.   By the time I saw the specialist both hands were swollen and painful to the point I was in tears. She ordered 21 x-rays taken. She also put me on Prednisone and in 2 days the swelling and  most of the pain was gone.  Went back for a followup on the 26th and got some good news.  Seems that so far there's been little damage done to my joints.  Deformation of the joints of my left foot and my left wrist only.  Tomorrow (3/27) I'll start the medicine which is a chemo-therapy pill.  May lose some of my hair.  Go back in April for follow-up.  Staying off the longarm for awhile; seems to aggravate my shoulders and hands (gripping the handles).


Bruce has put up a temporary wall between the living room and the dining room to keep the dust contained.  He tore out of the fireplace.  Then he took down the 3 exterior walls (one of those is the wall to the garage).  He's made 4 trips to the dump with all the rumble.  Molly got to go on the first trip.  Don't think she liked it much.   It's easier to do the wiring without the walls, besides we want to insulate them.  Older homes down here don't have insulation.  But with the weather getting colder each year, we're trying to get the exterior walls fixed.  

March 30th -  The 6 LED ceiling lights he had put in when we first moved down have now been separated into two switches.  4 on one switch and 2 on another.  That way we can just turn on the two right near the garage door when we go out in the evening.  It will shine enough into the kitchen that it will look like we're home.  Though most nights all lights are off except the one bedroom that we use as a TV room and it can't be seen from the front. 

The hardest part of this project is going to be selecting a tile or stone for the fireplace.  Thinking I'll let him decide since I got the say in the kitchen.

March 31st -   Happy almost Easter!  Well it was for us.  Had a brunch and Easter egg hunt at Alissa and Nick's.  So much fun watching the little ones having a great time.  Made this cute little bear for Alissa.  I know it should have gone to one of the grandchildren, but I bought the fur in 1990 to make it for her and never did.  In my cleaning out of my sewing room I came across it and instead of throwing it away, decided to make it.  

Ending the post with a picture of my penguin quilt.   Selma gave me the kit years ago.  When I joined a hand applique group down here I started working on it.  Just this past December I  finally quilted it.  It will be in the Camarillo Quilt show in April.