Definitions


Definitions:

Kids: Alissa, our daughter; Nick, our son-in-law Baby: Molly Kathleen, our granddaughter *after 2/8/17 Connor Daniel, our grandson Kaya: The Kids' Rhodesian Ridgeback
Up North: Our home in Walnut Creek, CA Down South: Our new home in Ventura, CA

Thursday, November 29, 2012

Guest Bath Saga continues.....

Many Trips to Home Depot and Lowes
Watch Molly
Play with Molly
Girls over for dinner - twice

It's been 9 days and I wish I had more progress to report.   Bruce finished the demo.  He got a "trench" cut in the concrete slab from where the pipe comes up in the middle of the floor back to the wall that is behind the master toilet.   He used his multi-tool and both masonry blades and metal blades and made just a small score line.  I took a picture of a new blade next to one he used for about 4 minutes.  After going through about 5 of them, he went and bought a blade for his circular saw.   I held the shop vac while he cut.  Still at times I couldn't see anything because of all the dust/smoke.   Few good whacks with a sledge hammer broke up the middle to a point where he could chisel out the rest of it.  Took several hours.

We made several trips to both Home Depot and Lowes to get all the pieces parts.  The amount of money we have invested in copper pipe and couplings is astonishing.  Did fine a place online where we can get it at half the cost and that includes shipping.  Bruce had over bought everything so he didn't have to make a trip in the middle of having the water shut off.  We'll return what we don't use.  But when we go to do the kitchen and master bath, we'll order on-line. 

New Tub drain line
Took a lot of searching but found a bathtub/shower mixer and sink faucet I liked.  Bruce made a trip out to Steve's plumbing (great place) and found that he can buy pieces parts that will actually let us adjust the pressure in the shower.  All the new mixers will only let you go from cold to hot, but don't allow for change in pressure.  So we'll end up taking back the fixture we bought.   The pieces parts are a lot less money, too.

Here's the picture of the new drain pipe for the tub (left).  To the right is the picture of the new single drain line for the sink plus the new copper pipes for the sink hot and cold.   Bruce hasn't rerouted the pipe in the new trench yet.

In between all this, I finished another sample for a pattern I'm writing for a quilted baby book.  Had the girls over for dinner a couple of times.  And babysat Molly both at Alissa's and here.  Those are always my favorite days. :)  Nick taught Molly how to sign for "more".  So when she's hungry she can tell us when she wants more.  Though you have to be careful not to say the word "more", cause she'll sign.  I think the next step is "hungry".  She's a smart cookie.  Here she's underneath our game table with Kaya.  Bruce and Alissa were working on banners for her first birthday party this coming Saturday.  Can't believe on the 5th she'll be a year old already.  Kaya is getting better at not running off whenever Molly gets too close.  It's so funny because she (Kaya) will follow Molly where ever she goes.





 

Tuesday, November 20, 2012

Guest Bath Demo - in Pictures!

1
Bruce took pictures as he was removing the vanity and said they tell a story themselves.  He even suggested I add these to the blog.  1. Is the vanity before demolition.

2
2.  This is what it looked like inside the cabinet under one of the sinks.  The brown area is just unpainted cabinetry.  Looks like they opened the doors and sprayed.  See the flex pipe all twisted around?  It's sprayed too.

3
3.  After taking the top off the vanity (sinks were molded into the counter top), the vanity just kind of fell apart. Note the brown area on the base of the vanity, that was the area under the drawers, so they didn't get sprayed.  There were holes in the wall where they opened up to work on the plumbing ... they just nailed up a piece of plywood so you couldn't see the holes when you opened the cabinet doors.  Oh, the area where the radio is sitting is where there must have been a medicine cabinet at one time.  Now it's just a painted hole between the studs.


4




4. We're still trying to figure out this pipe that comes up basically at the front of where the vanity was out of the floor and then back to the wall.  The brown and white areas are the floor of the vanity.  White is obviously where they opened the doors and sprayed, the brown particle board is under the drawers. All these holes were there, not ones Bruce made.  The big one in the wall did have a piece of particle board covering it, but not the one up the wall from the slot in the cabinet floor; but the drawer part of the vanity covered that area.
5
5.  This is with the vanity "floor" removed.  The white outline on the floor is the ever present caulk they used around everything to make it "look pretty".  Again, see how the pipe comes up out of the floor and then back to the wall.  Being that it's embedded in the cement slab it's hard to know where it goes.  It angles to the front left, so it's not a straight across to the shower.


6










6.  There are several of these cut off pipes where both sinks were.  If you look at the black drain/vent pipe, you'll see one of the cut pipes just sticking up there.  Realize that in the picture it almost looks like the pipe goes into the the black drain pipe, but it just ends right there.  Must be cut off at the front of the house somewhere.  The pipe going off to the right goes through the wall into the master bath toilet.

7
7.  These are the pipes behind the tub/shower.  It was nice the original owners had a slide in panel to access it.  The Fannie Mae people sheet rocked/textured/sprayed over it all.  Bruce will put a panel back incase or future problems.

8.  The floor.  The black area is actually just wet cement; wet from trying to get the glue off.  The light area is the paper backing from the original linoleum.  Bruce is on his way to buy something that is suppose to dissolve the glue.  Paint thinner didn't work.  In the picture (7) you can see the current linoleum.  The FM people put that down on top over the old stuff in both baths and the kitchen.  It always looks dirty, no matter how much I scrub it.  Like everything else, they laid it down to the edge of walls and cabinets and then caulked it to hide the raw edges and make it "look pretty".

The one good thing we found was the studs are mostly all redwood.  Of course there were two that weren't and they are pretty much termite eaten.  But replacing two isn't too bad.  And with the sheet rock down, we can actually put some insulation in the outside wall!  Which apparently is a novel idea for southern CA.   Tonight we'll go back to Home Depot to pick out a new vanity top, sink and fixtures.  I'm thinking brushed nickel.  

Saturday, November 17, 2012

Guest Bath - Starting!

Sick
Cough, cough, cough
Lot's of Molly time
Annabelle
Almost Garage sale
Rip out Vanity-guest bath
Order new Vanity

Still sick.  Just can't seem to shake this cough.  Been on antibiotics and prednisone with no help.

We were going to have a garage sale today.  Had all the boxed stuff out and priced, but then a storm hit.  So we packed it all up and put it back in the spare bedroom along with all of Alissa and Nick's stuff too.  Another time.

I wrote everything and had to come back to insert this paragraph.  How could I forget?  We got Annabelle set up last week!  Bruce even got the wiring moved from an overhead system to one that is below the frame.  Makes for a much cleaner look.  We have all the wiring for it tied up and out of Molly's way.  Only thing I couldn't put "up" was the foot pedal for the quilt advance.  But I do have it turned off when I'm not using the machine.  Just need to get some light in this room so I can actually work. I was going to work today after I got home from Alissa's but it was already too dark in the room.

We had ordered a new vanity at Home Depot, but then got a call that it was going to be an additional $150 because they didn't order the 5piece drawer fronts.  It was on their drawing but guess not in the order.  Bruce was a bit P-O'd so he canceled the whole thing.
 
Old Guest Bath
Went to Lowe's and ordered basically the same thing.  This designer almost forgot to specify the 5 piece drawer fronts.  And again it was an additional $150, but she could tell we were not happy about it, plus we had told her it was going to be the "test" to make sure we liked the brand.  That we had another bath and a kitchen to do.  She knocked off the additional costs.  So that was nice.  It will be 4 - 6 weeks before it's delivered.
 
Bruce tore out the old vanity today.  I was over watching Molly and keeping Alissa company today.  Lots of mold,  rotten wood and termite damage.  There's pipes that come up out of the concrete slab and are just cut off.  There's one pipe that runs from the front of the vanity edge back to the wall.  We have NO idea what it was for.  Actually Bruce has the theory that maybe there had been a problem and they cut off the old pipes and then tapped into the pipe from the shower and brought it up and ran it back to the wall.  You can see it in the picture. 
 Don't know whether we're going to have to bust out more concrete or not.  He's got to chisel some of it over around the toilet to get the floor level.  It's going to be so nice to have a second toilet!  But at the rate things are going, we'll need the full 6 weeks before the vanity comes in order to get everything fixed.  The nightmare continues!

Sunday, November 4, 2012

WINDOWS!!!

New Windows
New Slider
Molly's Walking!!

Bedroom windows out
Guest bedroom window going in
Mostly we've spent the week getting over our colds and waiting on the windows.  Our window guy was sick too, so the installation didn't start until Saturday.  They put in 11 windows! 
 


 
I'm sitting in my chair watching them put in or rather taking out the old slider.  I can see the two bedroom window from here and they look so nice.   It's like watching a home improvement show and the biggest TV ever!  Can't recommend CJ Windows enough.  They cleaned everything up as they went along.  Everything looks so fresh and clean.  No more putting a pin in the top of the slider to lock it!  Have a real lock now and even screens!  What a concept!!  Fresh air without flies!  Isn't this the cutest little double hung in our guest bath?
 
I was amazed yesterday at how much heat they kept out of my sewing room.  Usually in the afternoon I can barely stand to sit at my sewing table.  Can't wait till I get the blinds up.

It's all finished. Yea!  I've even managed to get some of my sewing room put together.  Lots more to do, but it's getting there.  The only thing I'm missing is lighting.  Hard to sew at night without light!





And the best news of course is that Miss Molly took her first steps on her own Halloween.  She was so cute in her glow in the dark skeleton PJs.  She took more steps the next day.