Kitchen Remodel - Day 13 to 17, Wednesday 20th

Cough, cough, cough.  Chills, fever, chills.  What a week.  Between the two of us we feel like death warmed over.  

But through it all we've managed to keep working a bit each day.


Monday saw the last of the flooring go.  I was bound and determined to get through it all. Except for an hour from each Bruce and Nick I managed to get it all done.  Still have to get some of the black adhesive off.  Bruce thinks a sander will work on that.  Only have one bruise to show for the whole thing.  The plain concrete is where the old cabinets were. The black is the adhesive on the floor. Still haven't figured out the spray painted area on the walls behind the cabinets.
  


Plumbing sculpture
Bruce had one leak in the plumbing; of course it was the worse possible area to repair.  I have a nice copper sculpture on my desk of the part he had to remove and redo.  But for the most part the plumbing is finished.  Drywall is up in the garage.  Washer and dryer are both hooked up and working.  Needing clean clothes is always a motivator.

Today, Wednesday 20th, we put up the temporary walls to enclose the kitchen.  Hoping that this will cut down the dust throughout the rest of the house.  Going to make getting in and out a challenge but will be well worth it.  Tomorrow we can start removing the rest of the sheet rock.  Bruce still needs to get the loose insulation cleared in the attic so we can open up the ceiling.  
2 wall from front door

1 start of temp walls
3 inside kitchen towards garage door
4 Inside look from living room across to sewing room


5 Outside corridor from sewing to livingroom





Friday, January 15, 2016

Kitchen Remodel - Day 10, 11, 12 - Wednesday, Thursday and Friday 15th

Had to go back and rewrite a few sentences on the last post.  I'm going to chalk my poor grammar to running a fever while I was writing.

Wednesday, January 13th


Went to the doctor.  Have a sinus infection.   Explains the fever but not the cough.  Now that I'm using the nasal spray my sinus have opened flood gates.  Rather have the fever and sleep.

Bruce made several trips to Home Depot including a late night run out to Camarillo and still couldn't find the right plumbing parts.  Of course the website says they have them.

Thursday, January 14th

Started chiseling on the floor again.  Made it all the way around the outside.  Stopped using the multi-tool because Bruce is afraid I'll burn out the motor.  All this hammering on the cement is not helping my headache.

We made another run to Home Depot.  This time to get 3 sheets of drywall.   Nick has a class tomorrow but is available on Sat and Sun to help get the Hot Water Heater out of the corner.

Friday, January 15th


Jog inn Wall
The plumbing in the garage is still giving him nightmares.  Adding that second filter just for the kitchen is the cause for all the trouble.  He had gotten some pipes in and realized they were going to be outside sheet rock.  Turns out there's a "jog" in the garage wall right past where the kitchen starts.  The picture to the left show the "jog" in the foundation.  The area of multi studs is the corner where the front of the house starts.  The big round dryer vent pipe is on our front porch. To the right of the multi studs is the kitchen.  


He needs to have all the new pipes in and ready to hook up tomorrow after Nick helps him get the Hot Water Heater out.  Hopefully, everything will hook up OK and we can get the sheet rock up in the corner.  It needs to be painted with at least one coat of primer to be up to code.  If we can get that all done tomorrow, we'll have hot water tomorrow night. Otherwise, it's showers at the kids and hopefully fixed on Sunday.  I remember a time when I could help lift things with Bruce.  Not so much anymore.


The metal recyclers came by today.  Got rid of all the old appliances and other metal debris. Gives us more room in the garage.  Plus no dump fees.

I moved all the boxes I had packed up from the dining area to under Annabelle.  She and they are all covered in plastic.  Here's also a picture of our make shift kitchen on my cutting table.  Don't think I'll be doing much sewing the next few months.

Still whittling away at the floor.  Most of it's coming up in just 1" hunks or smaller.   Been watching a lot of videos on YouTube and there's just no easy way.  Seems we'll need to pour boiling water on the adhesive and let it loosen then scrape it off.  Not looking forward to that process.


Tuesday, January 12, 2016

Kitchen Remodel Day 7, 8 & 9, Sunday/Monday/Tuesday

Sunday, January 10th

Emptied the rest of the kitchen cabinets and drawers.  Set up our make-shift kitchen on my cutting table in the sewing room.  

Got the sink out and opened the sheet rock behind it.  YUK.  I am so looking forward to knowing all the plumbing is new and done right.


I worked on taking all the medal runners off the drawers and cabinet pull-outs.  Then knocking the crap out of them till they came apart.  Felt so good.  We thought we were going to need a dumpster, but with everything getting broken down, should only take 3 truck fulls to the dump.

The kids came over after lunch and to help take down the cabinets that hung down over the peninsula.  It's amazing how it opens up the kitchen.  

Bruce reconnected the washer and dryer so I'm doing laundry tonight.  Then he can have at it with the plumbing.  

Monday, January 11th

We loaded up the truck with all the debris from the cabinets. Saving out the metal runners and pipes for the metal recyclers.  

I worked on the flooring again.  Found using the multitool with the scrapper blade works well. Just have to let it rest every so often so it doesn't over heat.

After lunch I started having chills and discovered I had a 101.2 fever.  Went to bed while Bruce worked on plumbing.

Tuesday, January 12th.

Still running a fever.  Really bums me out I'm missing out on more of the demo.  Want to get back to chiseling out the flooring. 

Nick came over and they got the rest of the upper cabinets down and the lowers out.  Pulled out Chamber's cook top.  It's a classic, but not in any condition to resell.  Have no clue what the brown areas on the wall are.  I know the previous owners were heavy smokers, but the cabinets were there.  Unless the the original kitchen just had shelves.  Who knows.

Bruce took apart the remaining cabinets and filled another truck load for the dump.  It's amazing how large the kitchen looks with nothing in it.  Hoping the cabinets and layout we've chosen will still make it look big.
 
Below is a picture showing two of the last flooring.  There's a third under the red.  It's the hardest to remove because of the adhesive they used to glue it to the cement slab.






Saturday, January 9, 2016

Kitchen Remodel Day 4,5,6 - Thurs/Friday/Sat

Yet another trip out to Home Depot.  We should have stock in their company.  Bought a laundry tub for the garage.  It will give us a place to wash up plaster and paint rather than in the bathroom sink.  


Bruce spent most of the day working on the water pipes.  Mapping out how to get the pipes in the right order and past one another.  When you have a whole house filter and water softener and it still doesn't make the water taste good what do you do?  You add another water filter.  This one is a carbon base like the Brita I use now for drinking water.  Bruce is tied of it in the refrigerator and I refuse to give Molly water out of the tap or make tea with tap water.  And since we'll finally be able to hook up the ice maker, I want the ice cubes to taste good too.  He's got to find a route to add the new carbon filter into the cold water line after the whole house filter and softener that goes into the kitchen sink and refrigerator.  

From the look of what was done in the past and other homes we've seen, people just don't think a thing about routing their water pipe around in circles to get to where they want to go. Not realizing that every turn reduces your water pressure.  Not only that but taking the long way around on your hot water wastes water trying to get the hot water through all the pipes. When we do the bathroom and add the laundry room, we'll be putting in a second hot water heater for those rooms and the guest bath.  Probably will take the large one from the garage and move it back there and replace the one in the garage to a smaller one that will just go to the kitchen.  So looking forward to that.  But that's years away unfortunately.

We had Molly from lunch time through dinner on Thursday.  She is so much fun.  Exhausting at times, but fun.  I'm constantly amazed at her vocabulary.  Wish I could remember what she said last night.  But she stopped mid story and you could see her little brain working then she used a word that totally surprised me.  Not just the word, but that she used it correctly.  Wish my brain was still as sharp as hers. :)

Today, Friday 8th, Ronni and Jim from the Kitchen Place came out to measure the walls. Apparently, Jim has to measure and make sure that our measurements and her cabinet layout will all fit.  Glad they double check everything before sending in the order.  All was good.

Saturday, 9th

Started with a trip to Nick's to borrow an extra battery charger and a second for an drill extension.  Ended up having to go to Lowe's for another extension and miscellaneous tools and more copper fittings.

Bruce got the hot and cold water copper pipes in from the garage to the sink.  They aren't attached yet since we're still using the old sink and haven't disconnected the existing lines.  If you only see one old line that's because the hot water is still connected under the slab.  The cold must have leaked at one point and that's when they put it through the cabinets.  

As I was vacuuming up all the drilling debris I noticed several layers of linoleum.  We knew the top layer was put on when the Fanny Mae people tried to make the house look good because it was in both bathrooms too.   This is several hours later; turns out there are 4 layers. The bottom one is glued to the slab.  I've been chiseling it off. Very slow going.  That little area of black you see filled up the 5 gallon bucket before I emptied it.  The area is only 36" by 36".  Have a long way to go!

Meanwhile back in the garage Bruce has changed out one gas line.  All went well and he got all the pilot lights back on.  Hoping now he won't be as worried about the other changes he needs to make.  He also go a lot of the copper water pipes reworked.  Because we're still using the kitchen, he can only get the pipes in the walls but not hooked up.  

He's adding a laundry tub and a second filter.  Think I told you that already.  Sorry if I repeat myself.  I'll try to read back; but tonight I'm too tired.

















Wednesday, January 6, 2016

Kitchen Remodel Day 2 and 3

Tuesday, January 5, 2016

Ordered our cabinets.  Brookhaven, shaker style in a Mocha.  Don't know why they call it Mocha when it's a deep pecan red.  All I know is I like it.  Also got the sink ordered from the plumbing shop.

Spent a lot of time going from store to store to store looking for the right parts.  They sell you a Filter System but not the parts you need to get it hooked up!!

Dishwasher got pulled out.  Drain pipe elbow looks like its made out of duct tape.  Until we decide to go into full demo mode, we're not messing with it.  Once the water gets turned off to the kitchen and the sink removed, then we'll see what we have there.

Mud Sill
Bruce got the mud sill in the hole where the oven cabinet had been.  They had cut it out. The cabinet looked like (if you look at yesterday's pictures) it was sitting on a pallet.  I thought they had stuffed plastic bags in there for some reason.  Actually it was a rat's nest.  Bruce was kind enough not to show me.  It had been vacant for some time.  YUK.

Wednesday, January 6, 2016

Drain pipe-Kitchen and washer
Water pipe inside cabinet
Bruce pulled out the cabinet next to where the dishwasher was.  OMG.  Got a good view of the drain pipe where it goes into the slab.  Got a good view of the outside too unfortunately. They cut out the mud sill where the drain pipe comes up from the slab, and left it as it.  From the outside you can't see anything because the siding hangs down over the mud sill.  But from the inside we can see day light coming through.  There was evidence of rat droppings under the cabinet.  Bruce filled the area with cement.

Drainpipe closeup

In the meantime there has been a thunder storm going on outside.  It's suppose to let up tomorrow and Friday and then hit us again Saturday.   Our back yard was underwater. Wish I had a picture of Bruce on the ladder peering over the fence.  Water back there was up to the first run of the ladder.   Not knocking the rain; heaven knows we need it. Just wish it would come in smaller doses over a longer period of time.  At least the water has drained off now.  There's a 6 foot drop to the neighbor's yard behind us.  That's their second story windows you see.  The left side of the house was flooded too.


Monday, January 4, 2016

January 2016 Day 1 of Kitchen remodel

Happy New Year Everyone!  May we all have a healthy and prosperous new year.

We have settled on the cabinets.  To fray some of the costs we're going with maple instead of cherry.  The finish is called Mocha, but looks more like a dark pecan to me.  I'm happy with the color; it has more red in it than the original Autumn that came in the cherry wood. Tomorrow (Jan 5th) we go in to finalize the order.  We'll stop and get the sink ordered too.

Molly spent the night Saturday night.  First night sleeping in Grampa's office/Molly's room and in her new bed.  She loved it.  Went right to sleep and slept in for us till 7am.    When you look at the pictures, Molly has most of the room.  But Grampa is fine with that.
Over the weekend we started packing up some of the kitchen.  It's amazing how much stuff one accumulates.  Trying to figure out what to pack and what not to...since we're Still cooking has been a challenge.  Figure everything on shelves I can't reach without a foot stool is fair game for packing first.

Well, it's Monday now and demo is well on it's way.  I couldn't stand sitting around waiting. Have most of the rarely used stuff packed.  Dishware and pans and food are all that's left. Our tenant Dave showed up with the rent check just in time.  Bruce had the oven half out, but it was too heavy for me to help and we couldn't find anything to slide under it.  Dave is a strong guy and helped Bruce muscle it to the floor.  The handtruck took care of getting it to the garage.  Guess there's no turning back now!

Just as a reminder of what the kitchen looked like.  Here are some pictures before we moved in.  There is a dishwasher, but it was never hooked up.  The the infamous oven that sticks out into the garage.  That white "box" with the flowers stenciled on it is the oven and cabinets.
1.  Wall Oven before
2. Kitchen - before
3.  Oven in the garage - before





Here are a few of the demo pictures:

Bruce moving oven cabinet

Oven out and sitting in garage
Bruce had to take the oven cabinet unit out through the kitchen.  If you look closely at the lower part of the picture to the right, you can see the gas pine that ran out from the wall around the cabinet and back to the wall on the other side.  A plumbers nightmare.

As I finish typing this up and posting it, Bruce is cutting a piece of plywood to cover the hole.  The temperatures have been down in the 30s in the mornings, so we need to get this closed up.

We're pleased with how much we've done on the first day.  And really just the first afternoon.  Once the cabinets are all empty and the refrigerator is moved into the dining area we'll really get the demo going.  You can't tell, but I'm sitting here with a BIG grin on my face.

Monday, December 28, 2015

December 2015

Bruce made, painted and hung the picture rails in both the sewing and living rooms.  Got 2 quilts hung.  Need more rods to hang more quilts. You can barely see the picture rails. Make the quilts look like they are floating.


Had our first meeting with Ronni at The Kitchen Place on the 9th.   She was so impressed with Bruce's layout in Excel.  She suggested we reverse the refrigerator and stove (which is what I wanted to begin with - but Bruce thought it would be too hard to move the gas line). So we went home and stewed on it for a long time.  Because there is a 6" difference between the two appliances it changed the cabinets too.  Went back with second drawing on the 14th.  Ronni said that she had showed everyone in the office Bruce's layout.  They couldn't figure out how he did it in Excel.  The man is an Excel Guru....that's how.

Was so worried about finding the right knobs and pulls but when she showed me the selection of "freebies" that come with the cabinets, I found the perfect ones.  Can't believe my luck!  Ronni will get the layout all computerized so we can actually see what the kitchen will look like. 

On the way home we stopped at Vic's plumbing.   I loved my sink(s) in Walnut Creek, where the disposal side was only 7" across which left a huge sink for pots and pans.  The smallest one I can find now is 10 1/2".  It's just like the one Alissa and Nick have.

Had to cancel our second meeting with Ronni due to a very nasty flu bug that first got to me and then Bruce.  I started at 10pm Wed the 16th and he began the next night.  Missed out on the cookie exchange with my quilt group.   By Sunday we were both eating solid food again but had absolutely no energy to do anything.

Next meeting with Ronni we saw her renderings.  So in love with this kitchen.  Unfortunately, the cabinets are a lot more than we expected. 



Before I got sick, Molly came over and we cut our sugar cookies and iced them.  We had a great time.








Bruce bought a white board for his office so Molly could draw on it.  This is a self portrait. 

Christmas Eve for us came on the 23rd.  The "kids" came over and we had Thai take out.  Usually have crab on Christmas Eve but there's no crab this year.  Had a nice evening.  Just like we did for Alissa, Molly got to open one present... Christmas PJs.

Christmas Day the 24th we went over to the kids.  Alissa made a yummy egg casserole and cinnamon rolls.  We nibbled and opened gifts all morning long.  Alissa made me an apron and it's so pretty I don't want to wear it and get it all stained!  Bruce got a remote control car that both Molly and Kaya love. 






On the actual Christmas day, Nick worked and the girls came and hung out.  They spent the afternoon/evening at the station house.

Today Bruce did a test run on cutting and re-threading black pipe for the new gas lines.  It did not go well.  The cutter wouldn't cut and the threading didn't work either.  Everything leaked.  Poor guy isn't sleeping as is worrying about all this.  He really hoped that if he did a test run before doing it up in the attic he'd finally be able to relax a bit.  No such luck.  Back to Home Depot or Lowe's tomorrow to try something different.

Hope everyone had a wonderful Christmas.