Definitions


Definitions:

Kids: Alissa, our daughter; Nick, our son-in-law Baby: Molly Kathleen, our granddaughter *after 2/8/17 Connor Daniel, our grandson Kaya: The Kids' Rhodesian Ridgeback
Up North: Our home in Walnut Creek, CA Down South: Our new home in Ventura, CA

Tuesday, June 27, 2017

The Barn - Installment 3

Where does the time go when you're having fun???  Oh my, it's been almost a year since I last posted and a year and 7 days since we started working on this house.

Where ever to begin?  

Most important thing first!  We have a wonderful new addition to our family.  Conner Daniel Strouse.  Born February 8, 2017.  He is such a sweetie.  Never seen a baby that smiles as much as he does!  Molly is totally in love with him and vice versa.  He grins and giggles every time he hears her voice.

Don't believe that the previous owners EVER had the house tented for termites in the 50 years they lived there.  It was tented during escrow when we bought it in 2015. 

Every time we needed to open up a wall or ceiling we discovered severe termite damage. Bruce wasn't sure what was holding up the kitchen ceiling.   Beams and studs have been replaced throughout the house.

All the new windows got put in and trimmed out.  Sold all the wrong sized ones on Craig's list.  Love Craig's list.  Sold 3 sets of mirrored closet doors too.

Hall bath was taken down to studs.  Put in a new tub and a beautiful subway white tile surround with a black and gray accent strip.  New white vanity and black/gray granite counter top.  New tile flooring...same as the kitchen.

Oh, yea the kitchen!  It's beautiful; not as beautiful as my new one, but I think anyone will be pleased with it.  We bought Ikea cabinets in gray. Over 100 boxes were delivered! Everything had to be assembled.  But once you do one cabinet, you can figure out the rest. Same with the drawers.  Actually enjoyed putting them together. The upper corners have built in lazy Susan's as do the lower corners. Bought LG stove, microwave and a Kitchenaid dishwasher. Since Bruce doesn't want me to share pictures yet, here's a picture from Ikea's website of the cabinets we used.

Had to refigure the master bathroom.  It had/has a massive shower in the same gray tile that was on the floor in the old kitchen.  Our realtor convinced us that we didn't need to redo it.  Still need to repaint the ceiling "in" the shower and clean the grout.  But they had a tiny little corner sink with basically no counter space. and a closet rod for cloths.  No door on the bathroom.  Bruce built out a walk-in closet and made room for a normal vanity.  It's only 4 feet, but at least there's room to put something down.   He has decided to make a wood counter top like what we did up north.  That hasn't happened yet.

I've been painting crown moulding and door casings for weeks!  And doors!  8 interior doors (bedrooms, bathrooms, master walk-in closet and door from family room to garage.  Not to mention 10 closet by-pass doors.  Bruce trimmed out all the closets and put up the new tracks today.  The base boards won't get down until the flooring is down.

Since the "barn" is just like our own house, we got to see what it would be like when we rip out the ugly stone fire place and hearth.  What a job that was.  The fire places are not centered on the wall.  The stone work goes from the fireplace all the way across to the side wall, just on one side.  Bruce managed to get all the stone to the dump in just two loads. His truck only holds 1000lbs and one trip was 1200 and the other 1300.  On the second trip there were some young men unloading asphalt.  They were amazed that he was still "working concrete" at his age.  Aren't we all?  

The new fireplace is stacked sandstone.   No raised hearth for a more modern look.  We haven't picked out the hearth stone yet because we need to match it up with the flooring. (Which arrives tomorrow).   He made a beautiful mantle for it and I've painted it white.  By the way, all the walls are painted a light gray/taupey color called Campfire Ash.  Alissa picked it out and I love it.  The picture I'm showing you of the tile we bought at Home Depot has a black and white mosaic tile above it.  It's very similar to the one we put in the hall bath. On my computer the "Stone Grey" tile looks pinkish, but there's no pink in it.  Just shades of gray.  Looked it up, America's spell it gray and the English spell it grey.

We've painted the 2 exterior walls around the patio, the back of the house and one side. Not painting the side that gets no sun.  The front we'll do a bit later.  We could use the sprayer on the stucco, but the front is wood and has too much trim so it will be easier to paint.  Think Bruce is up pressure washing the gables as I write this.  There's a massive overhang over the patio that he had to roll with a little paint roller.  Took days.

Like I said the flooring arrives tomorrow.  Not going to put it in until the patio and other cement is jack hammered and the new pavers are in.  

We still have all that to do plus the front yard is dirt.  He's been testing the sprinkler system and he gets one line repaired when a leak pops up somewhere else.  Seems there's two systems, one on top of another.  Of course it's always the bottom one that needs repairing! Once the system is working he can water the dirt enough to get it rototilled.  Haven't decided on ground cover or sod.  

We're hoping to have it on the market before the end of summer.  But when I start thinking of all that has to be done, I'm not sure if we'll make it.  Figure a week to jack hammer and haul the cement to a dumpster.  Another week to lay sand and pavers.  Then a good 10 days to put down the flooring through out the house.  A week to do the front painting.  Another week or two to do the front yard and back yard.  Plus you have to throw in time to go to Home Depot at least twice a week; decisions on what pavers to put down.  Oh, and window coverings. Once the floors are down then I have to get a house full of baseboards painted and nailed in. Oh, and we haven't worked out what to do with the front door yet.  Not to mention just cleaning up the house and getting all the tools carried back to our house. I'm more tired now than I was when I started typing!

So now you're caught up.  Doesn't sound like a years worth of work, but you'd be amazed at how long things take.  Specially when you add in all the trips to different stores.  Ordering and reordering pieces parts.  

We did take a week off of Thanksgiving and thoroughly enjoyed Julie and Kevin.  Can't wait to have more time to visit with them.  And of course we have Molly at least one day a week. Need to have our Molly "fix" to get us through the rest of the week.  

Tuesday, July 5, 2016

The Barn - 2nd installment

November 6, 2016

So much yet so little has been done.  Where to start?

Kitchen and hall bath have both been gutted.

Ordered 7 new windows from the only on-line cheap place we could find that matched the ones that were already replaced.  Long story short, they screwed up the order after they called to verify something and proceeded to change our order.  After dueling it out on the phone we got them to send us 4 corrected ones at cost.  We were able to use the non-retrofit windows in several places.  There were siding doors off two of the bedrooms, neither of which were the master.  Bruce took those out and rebuilt the walls and put windows back in.

Decided that stuccoing is a young mans sport!  800 lbs of stucco(basically cement) later we have walls.

All the walls are primed except for the family room....we're still using it as a work area, besides we plan to rip out the fireplace so it would just get messed up anyway.  All the ceilings are painted with ceiling paint.

37 LED lights are in throughout the house.

We had our realtor over to see the house and give us some insight as to what people here are looking for.  She thinks we are probably doing too much.  Said we shouldn't redo the master bath.  Nor take out all the cement that's around the back yard.  Well, we have stewed and stewed over the bathroom.  Think we have come up with a plan where we can leave the massive shower and just have it professionally cleaned and re-grouted.  When "they" redid it, they put in a corner sink with absolutely no counter top space.  The way we have it planned we can re configure the closet and get a 4' counter in.

The tile they used in both baths and the kitchen and entry were 8" clay tile in a two tone grayish color.  Nasty, nasty to get out.  The bathroom floor popped up easily, but not the kitchen.  They cemented it down on two layers of linoleum.  Took us weeks to get it up and all the "goo" off the floor.  Rough edge of the tile sliced right through my leather work gloves and my finger; OUCH.

Bruce built a "pony" wall for the eating counter.  We tiled the floor this past week.  Just got it grouted yesterday.  Or was it 2 days ago.

Ikea was having a sale on kitchens, so we purchased some very nice gray cabinets.   Been putting them together the last few days.  Have 8 of the 17 built.  Found one drawer bottom cracked, so will have to call tomorrow for a replacement.  They're very good about doing that.  

We've had Molly the last two Saturday nights for sleep overs.  She's so good and fun to have around.  I still marvel at her vocabulary.   She told Grampa the other day not to be "ridiculous".  And started a sentence with "Apparently"...    Just love that kid.

Oh, those great inflammatory drugs I mentioned last post...after taking for 10 days, I broke out in a rash and my tongue and lips swelled up.  Not taking those anymore!  Plus they decided it wasn't my hip but my back.  X-rays showed that and a compressed disc.  Go for a MRI soon; taking prednisone which is helping.

We are very excited that my niece Julie and husband Kevin are coming out for the week of Thanksgiving.  Can't wait.  Bruce said it will be our vacation too!!!  Yea!!

Hope you all have a wonderful holiday.

The Barn

As of June 20th, our tenants moved out.  One guy lost his job and the couple (the previous owner's son) broke up.  And because they were living there when we bought it, we didn't look at it as closely as we should have.  Thought they'd live there forever.

We have dubbed it "The Barn" because the roof over the garage is shaped like a barn. Decided we shouldn't keep calling it "Dave's house" since he doesn't live there any more.  

Bruce has spent a lot of time down there the last few weeks.  The popcorn ceilings have several layers of paint of them.  He thought he could knock it down to just look like texture. But no go.  Today the 4th bedroom is totally devoid of popcorn and carpet.

The floor plan is the same as ours with a few differences in the master bathroom and kitchen.

I've been going to physical therapy for my left hip for the past 4 weeks.  And just started anti-inflammatory drugs last week.  Which FINALLY relieved the pain.  After just an hour on the ladder today helping with the 4th bedroom, the pain was back.  Bruce observed that I come down the ladder with my left leg.  Think my therapist isn't going to be happy with me tomorrow.  

We still have the living room, family room and dining room ceilings to scrap.

Both bathrooms need to be totally redone and the kitchen too.  I spent this morning pricing out Ikea kitchens. 

To sell or rent is the big question.  We paid a lot more for this house than ours.  I was hoping we'd have years of rent saved up to do the needed upgrades.  7 months isn't gonna cut it.

It kills me to think I'm going to be redoing 2 bathrooms before mine gets done.  I'm trying to think of it as "practise".

There will be no pictures.  As my dearly departed brother-in-law would have said: "Pictures are evidence".

Friday, June 3, 2016

Kitchen Remodel FINISHED - Day 121 to 151 - May 1 to May 30

It's June 3rd; Kitchen has been finished for almost a week.  I had written the next paragraph weeks ago and then never got back to finishing.  

The floor is in!  Took 6 days of just laying the tiles.  Then there was a day of grouting followed by 3 days of keeping the grout damp so it cured slowly.  We picked a gray grout that matched the tiles, but it turned out a lot lighter than what we had hoped for.  I still love the way it looks.

While waiting on back splash, Bruce got the faucet in and the garbage disposal hooked up.  Yea, water in the kitchen. 

The stove and dishwasher were delivered.  He got the dishwasher hooked up.  Moved the refrigerator back into the kitchen.  For the first time in 4 years I have a working dishwasher AND my ice maker is now hooked up!  YEA!!!  It's the little things that mean so much.


What took the longest was picking the back splash.  Ended up using one of the first ones we brought home.  They're 2X12 glass tiles that have a white coating on the back.  Stacking a few   on the wall, they looked a creamy color though they were called GREY.  I had so wanted gray (USA spells it "gray" UK spells it "grey")  I was finally convinced that I wasn't going to find a gray that was light enough for Bruce.  And the creamy color went with the paint around the window. Had to wait a week to get the order delivered.   Boxes and boxes of tiles.  We bought bought gray mortar to set them with; and low and behold, they look gray.  A very light gray, just what I wanted.  

Like the flooring, we had a pretty good system going.  I'd mix the mortar and "butter" the tiles and Bruce set them in.  Had to get a "glass" saw blade for the new tile saw.  Cutting glass tiles is NOT easy.  When you see pictures of glass tile walls, they're usually small tiles, or a wall with no outlets.  Cutting around the outlets was a real challenge.  Plus they don't come with any edge pieces.  i.e. bullnose.  The tiles themselves have four bullnose edges, but once they're cut they're gone.   Didn't think of these things before we got started.  Bruce managed to cut a small edge piece off the long side of a tile and we used that as our trim.  The saw came with a splash guard over the blade.  Worked well for the floor tile.  But for the glass he had to remove the guard so he could see better.  After the first day of being soaking wet, he set up a plastic sheet to stand behind.


Tile cutting
It took two days to get all the tiles up.  Waited 48 hours and then grouted it.  I read the bag wrong, Ooops.  Thought it said after wiping off the excess grout to wait 2 to 3 hours before wiping off the rest and smoothing the lines.  It said 1 1/2 to 2 hours.  Ooops.  It was closer to 2+ hours and it was darn hard to get the grout lines smooth.

While we were waiting for the tiles to arrive, I started to put things in cabinets.  My different size pot drawers are perfect.  Yes, I have 2 very deep (standard size) "pot drawers".  But after looking at other peoples, it seemed like a waste of space...you have to stack the pots to use up the area.  Doing some careful measuring I got 3 drawers of single layers for all my skillets and pots.  I'm a happy camper. :) 

We're still working out the "bugs".   Bruce logic and Janna logic are not the same, so we're trying to get a feel for where things should be.  I ended up with a LOT of unused upper cabinets and not enough drawer space.  Don't ask me how.  But I'm working out solutions for it all.

There is a definite disadvantage to being short.  The upper corner cabinets are hard to reach.  They seemed fine in the "show room", but not so much now.  A lazy Susan has helped that problem.  Also the microwave is not meant for people under 5'6".   Opening it and getting things in and out is no problem.  Unfortunately, the lower edge has all the control info on it and blocks the view of what's going on inside.  At first we thought the light wasn't working when it was running.  Turns out we're just too short to see it.  

The stove went in with no problem other than Bruce crawling out from behind it and over the counter to get out after hooking up the gas line.  Wish he'd let me take a picture, it was quite comical.

After 4 years, I now have blinds in the window rather than the "temporary" curtains.  Helps cut down the afternoon heat. 

Love my "hutch".  Place for Bruce's keys, the phone, (freshly picked avocados) and all my colorful dishes.  And my half Susan is wonderfully easy to get things in and out of.  No more crawling on my hands and knees trying to get to the back corner.


Eating Counter Lights

Glass back splash






I smile every time I walk by, into or just think about this kitchen.  I love it!  It's the big kitchen I've always wanted.  Bruce has out done himself.

Ordered 36 square spice jars to go in a drawer.  Alissa is going to make me labels for all of them.  

I found a perfect dining room chairs.  We sat in them at
Ashley Furniture but the table they came with was too wide.  I looked on line and found them for $60/piece cheaper.  So we drove out to Burbank one day and picked them up.   Just wish I could find bar stools. Put the old chairs on Craig's list and they were picked up today.  I love Craig's list.  It has served us well over the years.

Bruce has designed a dining room table.  He's out in the garage painting the other side of the kitchen wall (per code).  Once that's done he can get his garage organized to start another project.

We got some unexpected news last week.  Our tenants are moving out.  We had hoped they'd be there for ever or at least a full year.  Dave grew up in that house.   Now we have to figure out whether to fix up and sell it or fix it to re-rent.  And Bruce was wondering what was going to keep him busy after the kitchen!

Next week we're taking 3 days off and going to our favorite little place in Nevada, Primm Valley Inn.  Lay in the sun and read books and do NOTHING.  

I start physical therapy for my aching hip next Friday.  Have to get from hurting going up and down steps.  I have a lot of ladder climbing in my future.... the rental house has popcorn ceilings that need to come down.  I lost 10 pounds doing ours, so I'm looking at this as an exercise program!

On June 11th it will be 4 years since we purchased this house.  Doesn't seem possible that it's been that long, it just feels like home now.  Just wish I could bring all my friends down here too.  









Sunday, May 1, 2016

Kitchen Remodel Day 91 to 121 April 1st to April 30th

April has come and gone already.  I had thought we would be done by now, but as with any major projects there's always set backs.

We got in a few Molly days which was such a nice break.  She even spent the night so her Mommy and Daddy could celebrate their 6th anniversary.  Molly was the first person to sit at our new eating counter and have something to eat.  Can you tell from her face it was Lemon Meringue pie?  But I'm getting way ahead of myself.

Bruce and Nick got the microwave/hood put in.  Bruce spent a few days in the attic and several trips to Lowe's to get all the venting hooked up.

Glass tiles
Crown molding
While we were waiting on the counter tops to be cut, Bruce got the crown molding in.   We also made "umpteen" trips to Lowe's and Home Depot and tile stores, bringing samples home and taking them back. We still have a table full of back splash tiles to return. Just can't find the right ones.


We purchased 6 boxes of flooring tiles we thought would work.  Once we laid a box full on the floor with the counter tops installed, we realized, or should I say "I" realized that the flooring we picked was not going to work.  All I could see were pink splotches.  Not good.  We returned the unopened boxes and went in search of new flooring.  Finally found a gray that we both liked.  It took 5 days to get them.  

On the 20th, the counter tops were delivered and installed.  They are absolutely gorgeous. For once I feel like I actually made a good decision. 

Once the counter tops were in, Bruce got the end panel on what I like to call my "hutch".  He was also able to finish the crown molding around that corner.

 

The last 2 days of the month we have been installing the flooring.  Back breaking work.  At least I've been able to help with this part of the kitchen.  We've got a good system going.  I do all the "on foot" part so he doesn't have to get up and down off his knees.  Mixing mortar, buttering the tiles, etc.  Glad we bought our own tile saw.  This is going to take several more days and it has already paid for itself in rental fees.   We've learned several things by doing this.  1. 12 X 24 tiles are very hard to lay.  2. We're old.

Speaking of old.... I'm actually posting this on May 1st.  Bruce's birthday.  He's out for his morning walk and then the kids are taking us out to breakfast.  He plans on laying more tile this afternoon.  We'll see; maybe he'll take a day of rest and give his back a break.























Wednesday, March 30, 2016

Kitchen Remodel - Days 80 to 90, March 21 to30th

There's been a lot of putting in and taking out.  Those of you who know Bruce know that things have to be exact to make him happy.  After getting the cabinet over the microwave in, he was so glad he moved the outlet.  

Monday, March 21st

Bruce and I went down to Ventura Stone.  Everything I had looked at and had liked when Alissa and I went, I no longer liked.  We took a larger piece of the cabinetry with us which made a big difference. As I had left with Alissa, I saw a piece I liked and wrote the name down but didn't get a picture of it.  Bruce saw it and really liked it.  And just like that we had agreed on what to get.  Put a deposit down and went on to the flooring store.  Wasn't so easy with the flooring.  I feel that the counter top is mostly white and gray with streaks of the reddish brown going through it.  So we've tabled the flooring hunt until we have a piece of the counter to take with us, or at least until we look at it again.

Tuesday to Saturday, March 22nd to 26th

Nick came over on his days off and helped with getting the upper right and part of the upper left cabinets in. It's so nice that they work well together.

My genius husband made a sliding pipe thingy that helped hold the front of the cabinets on the ledger boards making their work easier.

Bruce worked on getting the lowers in.  Nick and his Dad came over to help lift in the heavy corner Susans and half Susan.  The bump out from the drain pipe caused problems.  Bruce had to take the left cabinet and Susan out and sanded down the back of the cabinet to accommodate the bulge.  The corner now sits at a right angle the way it should.

Sunday, March 27th  - Happy Easter!




Went over to the to the kids for BBQ lunch.  Another couple was there with their two little girls.  After a yummy lunch we had an Easter egg hunt for the girls.

Monday, March 28th

Nick was here all day helping get the last 4 cabinets in.  The one going over the refrigerator is one of the hardest.  It extends out from the wall.  Lots of blocking went in. Everything looks so good.  Bruce was a bit surprised at the amount of floor space we have.  Between the little space we had before and our galley kitchen up north, he's not used to taking more than a step or two to cross from one counter to the other.
Tuesday, March 29th


Went to Mayan Hardwood to buy the plywood for the under layment for the counter tops. Also bought one piece of finished maple ply for the eating counter.  I was going to stain a piece and varathane the underside, but now it's all done. The end cabinet on the peninsula is our trash and recycling bins.  So glad to have them on the end.  Will be really convenient.  Can't wait to start filling everything up.  It's going to be a bit of trial and error was far as where everything should go.  Bruce is of the theory that the first time you reach for something and it's not there, then you need to move it to that spot.  I'm looking forward to having that long peninsula counter for baking cookies.


All cabinets in

Notice the unfinished edge on the end cabinet on the picture to the right?  Once the counter top is in, we have a finished panel that will get attached and sit on the counter top.  That cabinet is also longer than the other uppers.  It's my "hutch" for my dishes. The cabinet is only 24" wide; by making it longer we can get more shelves in at a height that I can reach.  Remember, Bruce and I are not tall people.   Bruce put an outlet in the wall space so that we can put the phone base there.

Went to Home Depot and got a Porter-Cable Pin Nailer to use on the cove molding.  It will fill in that gap at the top of the uppers.  I'm glad Bruce decided to get the nailer; he needs new "toys" to play with.  With Nick's Dad moving to Ventura next month, the 3 of them will put it to good use.  They're all into wood working.




Wednesday, March 30th

Bruce is out cutting the plywood for the counter tops.  Here's a picture of the first one cut.

Hoping to hear from Pacific Sales that the Microwave/Hood is there to pick up today.  It will give Bruce something to do while we're waiting for the counter tops to be cut.  We'll have the oven and dishwasher delivered once the floor is put down. It's nice that we were able to buy them last year while they were on sale.  The warranty period doesn't start until the day they deliver.  

Remember if you're getting these posts as an email that the pictures and layout are not that good.  May be easier to read if you go to the blog site itself.







Sunday, March 20, 2016

Kitchen Remodel - Days 65 to 79, March 7th to March 20th

Monday, March 7th

Broken record: Sand and spackle; sand and spackle.  Broken up with a trip to Home Depot.

I have been trying to get myself to go to the Modern Quilt Guild meeting in downtown Ventura ever since we got here.  Finally made myself drive downtown by myself.  Got a Habit burger and then dashed to the meeting place to wait for arrivals.  There's a key pad to get into the building.  I waited and waited.  Then it dawned on me, that the meeting was the second Monday of the month and even though the next day was the second Tuesday (and the Camarillo guild meeting), today was the first Monday of the month.  Dahhhh.  Sure felt dumb.

Tuesday, March 8th

I went to the Camarillo guild meeting and Bruce babysat for a few hours.

More sanding and spackling.

Wednesday, March 9th

I went over to the kids house and baby sat while they went with Nick's Dad to look at houses. David is moving to Ventura from LA.  Alissa is excited to have him closer.  I think we'll all enjoy his company.

Thursday, March 10th

Went to my applique group while Bruce got the walls and ceiling primed in the kitchen.

Had a 10%off coupon at Home Depot so we went out and bought more recessed lights for the dining area and the entry hall.  Bruce got the entry hall light installed.

Friday, March 11th

This is the 19th anniversary of Mom's (Bailey) death.  Seems like forever ago.  She would have gotten such a kick out of Miss Molly.

Got the ceiling painted.  Dining area lights installed.

March 12th, 13th, 14th, 15th and 16th 

I got 2 coats of Antique White on the kitchen walls where the paint will show.  It's more of a creamy yellow than white.  It's what's in the living, dining and sewing rooms.

Molly came to play a bit while Alissa was off with David again.

Bruce spent several days programming for one of his clients.

Alissa went with us to Costco.  Then Bruce mowed the lawn and trimmed the bushes in front.  We had dinner at the kids house which is always fun.  Yummy curry!

Oh, Alissa and I went to the counter top and the flooring stores to get some ideas.  Really need to have Bruce there for the final decision.  No body like my taste so I let others have the final say.  

I know this is all boring, but I'm keeping track of our days for us.  It'll get more exciting tomorrow. 

Thursday, March 17th

FINALLY - the cabinets are here!!  A 53' truck showed up around 9:30am.  Just Bruce and 2 guys to unload 21 cabinets.  Came up the driveway through the garage into the dining and living rooms.  Except for 3 which stayed in the garage.  Lack of space.  Bruce and I got those moved in later.  The pantry we had to take the front door off the hinges to get it in.

The color is darker than I thought, but I still love them.  It took us hours to unwrap all the cabinets.  We have a huge roll of packing material to take to the dump.

Friday, March 18th

Molly came while Bruce, Nick and Alissa went with David to his new house for the inspections.  He bought a house just down the street and around the corner.  Wasn't until every left that Molly and I realized there wasn't a place to play.  The living room was full of cabinets and her play table in Bruce's office was covered with tax forms that could not be disturbed.  She played on my computer for awhile.  There are some great games on the Curious George website.  Then we doodled on the white board.

Bruce finished up the taxes.  Never a fun event.  Specially this time with the sale of the Walnut Creek house. 

We went to dinner at my favorite Mexican place, Yolanda's.  Not Bruce's and I only like them because they have really good and cheap Margarita's.

Saturday, March 19th

We played musical cabinets.  Got them all lined up in order that they will be installed. Numbered them all. 

We picked up some KFC and went over and had dinner with the girls.  Nick is working until Tuesday.  It's hard seeing the cabinets sit there, but they're way too heavy for me to help hold them up.

Sunday, March 20th

Bad day at black rock.  Only those of you old enough to have grown up watching TV westerns will get that reference.

After studying the moldings that go up around the top of the cabinets, Bruce figured out that we needed to change the ledger markings.  With the kitchen sloping the way it does it's been a real challenge.  Long story short, he had put the out let for the microwave/hood 1" too low. He stewed over it for a long time.  Then he cut a hole in the sheet rock and moved the outlet.  More sanding and spackling!   It was either that or cut a notch in the bottom of the upper cabinet.  That just wasn't right.

Darn I just hit the publish button rather than the save button.  I haven't added pictures yet!