Definitions


Definitions:

Kids: Alissa, our daughter; Nick, our son-in-law Baby: Molly Kathleen, our granddaughter *after 2/8/17 Connor Daniel, our grandson Kaya: The Kids' Rhodesian Ridgeback
Up North: Our home in Walnut Creek, CA Down South: Our new home in Ventura, CA

Wednesday, March 30, 2016

Kitchen Remodel - Days 80 to 90, March 21 to30th

There's been a lot of putting in and taking out.  Those of you who know Bruce know that things have to be exact to make him happy.  After getting the cabinet over the microwave in, he was so glad he moved the outlet.  

Monday, March 21st

Bruce and I went down to Ventura Stone.  Everything I had looked at and had liked when Alissa and I went, I no longer liked.  We took a larger piece of the cabinetry with us which made a big difference. As I had left with Alissa, I saw a piece I liked and wrote the name down but didn't get a picture of it.  Bruce saw it and really liked it.  And just like that we had agreed on what to get.  Put a deposit down and went on to the flooring store.  Wasn't so easy with the flooring.  I feel that the counter top is mostly white and gray with streaks of the reddish brown going through it.  So we've tabled the flooring hunt until we have a piece of the counter to take with us, or at least until we look at it again.

Tuesday to Saturday, March 22nd to 26th

Nick came over on his days off and helped with getting the upper right and part of the upper left cabinets in. It's so nice that they work well together.

My genius husband made a sliding pipe thingy that helped hold the front of the cabinets on the ledger boards making their work easier.

Bruce worked on getting the lowers in.  Nick and his Dad came over to help lift in the heavy corner Susans and half Susan.  The bump out from the drain pipe caused problems.  Bruce had to take the left cabinet and Susan out and sanded down the back of the cabinet to accommodate the bulge.  The corner now sits at a right angle the way it should.

Sunday, March 27th  - Happy Easter!




Went over to the to the kids for BBQ lunch.  Another couple was there with their two little girls.  After a yummy lunch we had an Easter egg hunt for the girls.

Monday, March 28th

Nick was here all day helping get the last 4 cabinets in.  The one going over the refrigerator is one of the hardest.  It extends out from the wall.  Lots of blocking went in. Everything looks so good.  Bruce was a bit surprised at the amount of floor space we have.  Between the little space we had before and our galley kitchen up north, he's not used to taking more than a step or two to cross from one counter to the other.
Tuesday, March 29th


Went to Mayan Hardwood to buy the plywood for the under layment for the counter tops. Also bought one piece of finished maple ply for the eating counter.  I was going to stain a piece and varathane the underside, but now it's all done. The end cabinet on the peninsula is our trash and recycling bins.  So glad to have them on the end.  Will be really convenient.  Can't wait to start filling everything up.  It's going to be a bit of trial and error was far as where everything should go.  Bruce is of the theory that the first time you reach for something and it's not there, then you need to move it to that spot.  I'm looking forward to having that long peninsula counter for baking cookies.


All cabinets in

Notice the unfinished edge on the end cabinet on the picture to the right?  Once the counter top is in, we have a finished panel that will get attached and sit on the counter top.  That cabinet is also longer than the other uppers.  It's my "hutch" for my dishes. The cabinet is only 24" wide; by making it longer we can get more shelves in at a height that I can reach.  Remember, Bruce and I are not tall people.   Bruce put an outlet in the wall space so that we can put the phone base there.

Went to Home Depot and got a Porter-Cable Pin Nailer to use on the cove molding.  It will fill in that gap at the top of the uppers.  I'm glad Bruce decided to get the nailer; he needs new "toys" to play with.  With Nick's Dad moving to Ventura next month, the 3 of them will put it to good use.  They're all into wood working.




Wednesday, March 30th

Bruce is out cutting the plywood for the counter tops.  Here's a picture of the first one cut.

Hoping to hear from Pacific Sales that the Microwave/Hood is there to pick up today.  It will give Bruce something to do while we're waiting for the counter tops to be cut.  We'll have the oven and dishwasher delivered once the floor is put down. It's nice that we were able to buy them last year while they were on sale.  The warranty period doesn't start until the day they deliver.  

Remember if you're getting these posts as an email that the pictures and layout are not that good.  May be easier to read if you go to the blog site itself.







Sunday, March 20, 2016

Kitchen Remodel - Days 65 to 79, March 7th to March 20th

Monday, March 7th

Broken record: Sand and spackle; sand and spackle.  Broken up with a trip to Home Depot.

I have been trying to get myself to go to the Modern Quilt Guild meeting in downtown Ventura ever since we got here.  Finally made myself drive downtown by myself.  Got a Habit burger and then dashed to the meeting place to wait for arrivals.  There's a key pad to get into the building.  I waited and waited.  Then it dawned on me, that the meeting was the second Monday of the month and even though the next day was the second Tuesday (and the Camarillo guild meeting), today was the first Monday of the month.  Dahhhh.  Sure felt dumb.

Tuesday, March 8th

I went to the Camarillo guild meeting and Bruce babysat for a few hours.

More sanding and spackling.

Wednesday, March 9th

I went over to the kids house and baby sat while they went with Nick's Dad to look at houses. David is moving to Ventura from LA.  Alissa is excited to have him closer.  I think we'll all enjoy his company.

Thursday, March 10th

Went to my applique group while Bruce got the walls and ceiling primed in the kitchen.

Had a 10%off coupon at Home Depot so we went out and bought more recessed lights for the dining area and the entry hall.  Bruce got the entry hall light installed.

Friday, March 11th

This is the 19th anniversary of Mom's (Bailey) death.  Seems like forever ago.  She would have gotten such a kick out of Miss Molly.

Got the ceiling painted.  Dining area lights installed.

March 12th, 13th, 14th, 15th and 16th 

I got 2 coats of Antique White on the kitchen walls where the paint will show.  It's more of a creamy yellow than white.  It's what's in the living, dining and sewing rooms.

Molly came to play a bit while Alissa was off with David again.

Bruce spent several days programming for one of his clients.

Alissa went with us to Costco.  Then Bruce mowed the lawn and trimmed the bushes in front.  We had dinner at the kids house which is always fun.  Yummy curry!

Oh, Alissa and I went to the counter top and the flooring stores to get some ideas.  Really need to have Bruce there for the final decision.  No body like my taste so I let others have the final say.  

I know this is all boring, but I'm keeping track of our days for us.  It'll get more exciting tomorrow. 

Thursday, March 17th

FINALLY - the cabinets are here!!  A 53' truck showed up around 9:30am.  Just Bruce and 2 guys to unload 21 cabinets.  Came up the driveway through the garage into the dining and living rooms.  Except for 3 which stayed in the garage.  Lack of space.  Bruce and I got those moved in later.  The pantry we had to take the front door off the hinges to get it in.

The color is darker than I thought, but I still love them.  It took us hours to unwrap all the cabinets.  We have a huge roll of packing material to take to the dump.

Friday, March 18th

Molly came while Bruce, Nick and Alissa went with David to his new house for the inspections.  He bought a house just down the street and around the corner.  Wasn't until every left that Molly and I realized there wasn't a place to play.  The living room was full of cabinets and her play table in Bruce's office was covered with tax forms that could not be disturbed.  She played on my computer for awhile.  There are some great games on the Curious George website.  Then we doodled on the white board.

Bruce finished up the taxes.  Never a fun event.  Specially this time with the sale of the Walnut Creek house. 

We went to dinner at my favorite Mexican place, Yolanda's.  Not Bruce's and I only like them because they have really good and cheap Margarita's.

Saturday, March 19th

We played musical cabinets.  Got them all lined up in order that they will be installed. Numbered them all. 

We picked up some KFC and went over and had dinner with the girls.  Nick is working until Tuesday.  It's hard seeing the cabinets sit there, but they're way too heavy for me to help hold them up.

Sunday, March 20th

Bad day at black rock.  Only those of you old enough to have grown up watching TV westerns will get that reference.

After studying the moldings that go up around the top of the cabinets, Bruce figured out that we needed to change the ledger markings.  With the kitchen sloping the way it does it's been a real challenge.  Long story short, he had put the out let for the microwave/hood 1" too low. He stewed over it for a long time.  Then he cut a hole in the sheet rock and moved the outlet.  More sanding and spackling!   It was either that or cut a notch in the bottom of the upper cabinet.  That just wasn't right.

Darn I just hit the publish button rather than the save button.  I haven't added pictures yet!
















Sunday, March 6, 2016

Kitchen Remodel - Day 49 to 64 February 20th to March 6th

It's been weeks of spackling and sanding.  Even at this very moment Bruce is still sanding. Here's how the time has gone:

Saturday, February 20th

We actually took a day off and went to Pasadena to Quilt Con.  I have the best hubby in the world that he takes me to these things.  I'm still not good at driving too far towards LA.  The show is put on by The Modern Quilt Guild.  Unlike local guilds they are nationwide; this year their show was here, next it will be in Georgia.  They have a local chapter here in Ventura; I'm going to try to go to a meeting tomorrow night.  Bruce liked it better than most shows just because the quilts were very modern and artistic.  

Sunday, February 21st

Rain's coming so Bruce spend the morning spraying weeds in the backyard.  It's mostly weeds now.

Got the first layer of patch over the protruding drain pipe in the wall.  As I told you previously, the drain pipe was not centered in the stud space.  "Their" original fix was small pipes and a lot of duct tape.  Without tearing up the slab, breaking into the exterior wall all that could be down is to let the pipe protrude into the drywall. 

Monday, February 22nd to Friday 26th

Bruce just worked on layers of spackle.  After reading and watching a lot on the Internet he decided to try the premixed spackle.  It takes a LOT longer to dry than the 40 minute powered stuff he usually uses.   In one of our many trips to the hardware store we found a new fiberglass tape for the sheet rock seams.  He said it goes on much better than the mess or the paper BUT it's fiberglass and he ended up with all those little fibers in his hands.  And it's not a job you can do with gloves on.

We shopped around and picked out a faucet we like.  Not an easy thing to do.  Most of the new ones have the hand on the right side of the faucet.  If you have a dish in your right hand and want to scrap food off it into the garbage disposal on the left, you have to reach over with your left hand and end up getting your left arm wet.  People just don't think these things through.  Most would say, I'm right handed so that works.  Having the handle on the top of the faucet lets you turn it on with either hand and not reach through the running water.

Friday night we babysat for Molly while Alissa had a Thirty-One Gifts party.  Did you know she was selling this stuff.  Great bags and other stuff.  I'm really loving all my things.  Check it out:  https://www.mythirtyone.com/AlissaStrouse 

Saturday, February 27th

Bruce got the electrical outlets wired and in.  Of course, more spackling and sanding.

Cabinet sample color
Met with Ronni at the Kitchen Places where we ordered our cabinets.  They're right on schedule and the cabinets will arrive on March 16th; bar any snow storms on the east coast. She had a set of schematics for the cabinet installation.  Bruce was thrilled that they offered the help.  Pretty much the way he was going to do things, but there were a few things that will help.

Stopped by a tile place looking for back splash and flooring tiles.  Really need a sample of the cabinets and picking a counter top before we choose the other.

Sunday, February 28th and the Morning of February 29th

Spackling and sanding.  Add to this me scrapping mastic off the concrete.  Trying to get rid of all the old stuff so the new will lay down smoothly.

Monday, February 29th to Wednesday, March 2nd

Picked up Molly from daycare at noon.  She's going to be spending 3 days with us, while Nick collects on his Christmas present from Alissa and they go to Monterey.

We had a great time.  Molly's a great kid, but she is 4 and so full of energy.  Tuesday, her day without school, we went to the Fun Zone.  What a great place!  Lots of kids and things to play with and climb on.  You just pay for the kids and the adults get in for free and you can stay as long as you like.  Even bring food in.  There's tables and chairs plus Wi-fi and couches for the adults.  Molly and I played air hockey.

Needless to say, there was not much done on the kitchen during these 3 days.  Bruce did get more spackling and sanding done while she was at school on Wednesday.

Thursday, March 3rd and Friday 4th

Today is my brother's 71st birthday.  Happy Birthday, Jack.  It's also our niece's "Gotcha Day".  That was the day they left Warsaw with their adopted 4 year old Veronika Rose. She's been a delightful addition to the family ever since.

More spackling and sanding.  Or sanding and spackling. Layer after layer.  We did mark out where the cabinets go, so he's not wasting time making those area perfect.  The biggest and hardest area is the ceiling.  He hates when you can see where the ridge is if you don't get it feathered out just right.

Saturday, March 5th

I missed the fun while I was getting my hair cut.  Bruce took down the "wall" of plastic. Before he had it completely down Nick and Molly showed up to help.  He had promised Molly she could help.  And apparently she did.  Once the 1X3's were on the floor she used a crowbar to pull the base from the uprights.  Wish I had pictures.  Then she spent time in the garage hammer the nails down so the points were protruding.  She was just putting away her hammer in her own little tool box when I got home.  Such a cutie!

Bruce and I set up a mock up dining area to see how things will lay out.  He needs to get the dining room lights in so we can paint from the kitchen ceiling out into the dining area. Lots of decisions to make. The biggest is what about Dad's dining table (at Alissa's temporarily).  And actually it was Dad's grandmothers.  It's a beautiful table and they just don't make them that well anymore.  But it's no one's style.  Plus I've never EVER had my own dining table.  Just hand me downs. I'm ready. Since we brought out the kitchen into the dining area, we need a narrower table anyway.

Having the "wall" down, we can better visualize everything. Really pleased at how the change in the entry wall turned out.  We took out about 10" of the upper part of the wall and brought the lower out another 12"  making a "cutout" of about 24" for the eating counter. You can see on the picture on the right where the entry tile and wood from the dining area meet, that's where the wall used to stop.

Sunday, March 6th

Finished up with a little sanding.  Mopped the walls to get all the dust off.  First coat of primary on 3 1/2 walls and the ceiling.  We ran out before finishing.  New sheet rock really soaks up the paint.  

Nine days before the cabinets arrive.  YEA!!!  Another coat of primer and then a first coat of color.  There really isn't going to much wall color.  A bit around and above the window, the edges where the cabinets end at the end of the two side walls and the dining room side of the bar wall around to the entry.  Oh, and behind where the refrigerator.  Just painting it the Antique White that's in the rest of the front of the house.  It has a light yellow appearance to it.  Going to tile from the counter up to the top of the cabinets.












Friday, February 19, 2016

Kitchen Remodel - Day 38 to 48, February 9th to 19th

Wednesday,February 10th

Had to make several trips to several different hardware stores.  For some reason it's hard to find the right configuration needed.  Bruce is getting frustrated and I don't blame him.

Thursday, February 11th

I had a nice break (not that I need one) to go to my Thursday morning applique group.

behind sink
Bruce got the drain pipe in.  He reconfigured the pipe that goes into the garage for the washer, sink and water softener with all new pipes.  




garage sink with softener drainpipe

Friday, February 12th

Had to make 2 trips to Home Depot for sink connectors for the garage wash tub sink.  The ones that came with the sick were only 6" long; pretty useless.  But Bruce got the right ones finally and got the sink hooked up.  Yea, no more washing paint brushes, etc in the kitchen sink!

Had a nice dinner at the kids house.  BBQ'd hamburgers and mac and cheese.  My kind of meal!  Did you know that was our wedding night dinner?  Yea, some little hamburger joint on the road going up to Tahoe.  Makes me smile just remember what fun we had.

Saturday, February 13th

Took the girls to breakfast.  

Bruce got more blocking up between the studs.  Wants to make sure that there's solid place to secure the cabinets.  He got most of the insulation in the two exterior walls.   One of those is the garage wall.


I got to enjoy the day with the girls.  We went shopping for goodies.  Made cut out cookies in the shape of hearts, stars and flowers.  Got them all decorated for gifts.  Such fun.

Sunday, February 14th  Happy Valentine's Day!

Bruce took the day off.....well from working on the kitchen.  He programmed all day.

Took the girls to Sharky's Mexican food for lunch.  One of Molly's favorites.  That and Red Robin.  I think they are only her favorites cause it's where we take her the most.

Monday, February 15th

Finished insulating the walls.  You know Bruce does a lot more than I end up writing about. There are so many little things that have to be tweaked or done that I don't see or forget to write down.  Light the lights falling out of the ceiling because of the hammering.  They are pushed all the way in because we need to take them out to paint.  I think he finally took all but the two center ones out completely and went back to using work lights.

Went to Home Depot for sheet rock for the walls.  While I stood in line to return left over insulation, he loaded 12 sheets on a cart.  After we paid for them I waited while he got the truck.  The "loader" was there helping someone else; as soon as he was finished he looked and me and the sheet rock, the next thing I knew he was no where to be found.  I helped Bruce load the truck.  At home he carried them all in the house and I just helped stack them on the floor.  Needless to say he was exhausted at the end of the day.  That stuff is heavy!

Have you noticed how clean the site is?  Bruce vacuums and cleans up every day.  He can't stand messes.  My sewing room drives him crazy. :)

Tuesday, February 16th

Bruce got the "pony" wall up.  Don't know why he calls it that.  It's the half wall for the peninsula and eating counter.  Got the brackets in.  Had an old shelf to put on top of the brackets so no one runs into them.


The end wall got built.  We designed it so that the entry wall is cut back (and built out at the bottom) at the top where the end of the eating counter is located.

Wednesday, February 17th

Bruce got the grass cut.  Suppose to rain tomorrow.

I babysat over at Molly's in the afternoon.  Nick is at a "Ropes" class all this week.  

The garage wall got sheet rocked.  Bruce is only putting in enough screws to hold it in place; he'll go back later and add more screws.  It's a very tiring process.  (More so when you're 66)

Thursday, February 18th 

I escaped again to my applique group in the morning.  I "built" the second tower of the Golden Gate Bridge. :)

Meanwhile, Bruce got the peninsula and entry walls and part of the exterior wall sheet rocked.  When I got home he handed me the multi-tool to cut out the notches for the brackets on the dining room side of the peninsula wall.  You can do a lot of damage with that thing!

Friday, February 19th

That little black triangle is the drainpipe
Got the sheet rock on the exterior wall finished.  The drain pipe going into the slab is not centered so it sticks out pass the studs.  It's no wonder the old one was jerry-rigged with duct tape.  So that had to be cut around.  He finished up all the odd on end pieces of sheet rock. Like the around the corner.  Forgot that the entry wall has "orange peel" texture on it.  Our new little lower wall has to be matched to it. Either that or Bruce will have to skim coat the rest of the entry wall with spackle to smooth it out to match the new all. Better look, but very messy to do because it all has to be done, sanded and re-done and sanded some more. That wall is open to my sewing room.
Entry corner of eating counter

Bruce also got the rest of the sheet rock screws in.  Took him till 5pm to finish up.

Wish this program would let me draw arrows to the pictures. :)   If you have forgotten or you can go back to December 2015 to see the rendering of what this all is suppose to look like when it's finished.






















Tuesday, February 9, 2016

Kitchen Remodel - Day 26 to 37 January 28th to February 8th.

Thursday, January 28th
Another trip to Lowe's.  Now that Home Depot doesn't give us the "Lowe's discount" when using the Home Depot card, we're using Lowe's more often.  Bought more wire.

I went to my applique group in the morning.  I so enjoy being around other quilters once a week.  The guild meeting here is during the day which I find hard to get used to.

Bruce worked on electrical all day.

Friday, January 29th

I babysat Molly in the morning at their house while the kids went to a teacher parent meeting.  It was nice to have just some one on one time with Miss Molly.

Bruce continued to work on the electrical.  Don't think most people realize how much wire runs through their walls.

The kids treated us to a night at the Aloha Steakhouse for our 45th wedding anniversary. Can you believe it's been that long?   Looking back I realize what a wonderful life it's been together.  If fate hadn't landed us at the same place at the same time all those many years ago...well I just can't imagine any other life.

Saturday, January 30th

Back to Lowe's for more wire, outlets, covers and miscellaneous electrical supplies.  We should buy stock!  Stopped at the kids and borrowed Nick's nailer.  How much faster does that make the work!

Bruce got some of the bracing in between the rafters.  

Sunday, January 31st

Bruce finished putting up the bracing, then stapled up the insulation.  Will help keep the house warmer.  

I worked on my 3 quilt patterns that I still hope to publish.  Got the layouts all set up the same.  After the kitchen is finished I'm hoping Bruce will give his stamp of approval so I can pass them along to Alissa.  There are still several people out there that keep asking me when they can buy my patterns.

Monday, February 1st

Bad at the ranch.  Bruce cut the hole for one of the pendants off by 1/2".  A trip to Lowe's for a smaller electrical box we're hoping will solve the problem rather than patching.  He continued working on electrical.  Told you, you'd be amazed about the amount of wiring it takes.

Tuesday, February 2nd

Yes, more electrical.  Got all the boxes (though these are round) in for the pendant lights.

Wednesday, February 3rd

Yes, more electrical.  Think he's finished with all the wires up in the attic now.  If you've been following us for awhile, you'll remember last May the transformer blew up on the power pole a few doors down, blowing our electrical meter completely off the side of the house. Anyway, when the electricians came to put in a new circuit panel and meter they had to go up in the attic.  They were very impressed with Bruce's electrical work.  He didn't tell him he had done it.  

Cut the upper corner of the entry wall away.   Our eating counter will open up at that point.  It will let in more light to that side of the kitchen.

Thursday, February 4th

I got the morning off to go to my applique group.  My favorite day of the week.

Bruce went to Home Depot to buy more studs for the peninsula and some insulation for the walls.

Peninsula wall built
The top of the peninsula wall needed to be notched in 5 places for brackets to support the eating counter.  Took him hours to do it the 5 2" notches one slice at a time on the radial arm saw.  Brought it in the house and realized he had done the notches on the wrong edge of the wood. To quote him: "#$%%^$$*# ".

Friday, February 5th

Installed the outside lights timer in the wall socket in the entry.  I got the job of reading all the instructions and got it set up.

Bruce got the blocking in at the corner where he removed the upper half of the wall.  

I cut the insulation tubing and got all the hot water pipes covered except the few around the drain pipe...which has to be replaced first.

We had a nice dinner out with the kids and Molly at Wood Ranch.  Yummy BBQ baby back ribs!

Saturday, February 6th

Bruce re-cut the top board for the peninsula wall.  This time with no $%#^.  He got the wall built and the electrical boxes put in.  The wall is just leaning against another wall for the time being.  He has to finish building out the notched wall to attach the peninsula wall to it.  He may not put it in until we have cabinets to help support it.  Not sure.

We took a field trip to a flooring place downtown.  Saw a number of tiles that I like.  Still feel we need to settle on a counter top before choosing the flooring.  Though we're going to go with a light beige, neutrally color.

Sunday, February 7th

Just did odds and ends in the morning.  It's SUPER BOWL Sunday after all!  Congrats to Peyton Manning for his 200th win.

Monday, February 8th

We have ceiling!
Bruce and I went and bought sheet rock for the ceiling and joint compound.  Nick came over and the two of them got the ceiling up.  YEA!  It's rebuilding time!

After lunch with the kids, we got the ceiling marked for the lights.

Thursday, February 9th


I went to the guild meeting this morning while Bruce got the recessed lights in the kitchen. We have these throughout the house and they are the greatest lights.  LEDs that use very little energy to run and give off a nice light.  Bruce likes them so much he emailed the company to tell them.  That doesn't happen very often.  There are 8 lights altogether (not all show in this picture).  The blue circles are the boxes for pendant lights over the eating counter.  Bruce set up the 6 task lights around the counter on one switch, the two center lights on a switch and the pendants on a third switch.  That way if we're just going in to grab a drink we can just turn on 2 lights and not all of them.  It's gonna be nice folks!