Definitions


Definitions:

Kids: Alissa, our daughter; Nick, our son-in-law Baby: Molly Kathleen, our granddaughter *after 2/8/17 Connor Daniel, our grandson Kaya: The Kids' Rhodesian Ridgeback
Up North: Our home in Walnut Creek, CA Down South: Our new home in Ventura, CA

Tuesday, November 6, 2018

October 2018

October 2018

I'm typing this on October 17 as I just posted September.  Time does seem to slip by faster and faster.


Had a wonderful 70th birthday dinner with my little family.  We went to Lure Fish House.  Alissa made me a wonderful present.  A metal board that she put pictures on with magnets.  We have it up in the living room.  Leaving the picture large so you can see the pictures that are on it.  It reads:  "My Favorite people call me Gramma".
She also sent me some beautiful flowers.

We babysat on the 7th so Nick could take Alissa out for a nice birthday dinner.  Unfortunately, he had to work on her birthday (8th).  He had scheduled it off, but things happen.   Alissa had a nice brunch with a group of her friends and Bruce babysat Connor while Molly was at school.  Monday night we took her and the kids to the pub and had a birthday dinner.

Every year my small group of quilting friends here make a quilt to be raffled off as a Breast Cancer fund raiser.  This year we're doing a "row" quilt.  My "row" were Owls.  We have trees, and campers, birds, stars and other things being made by other members.  The quilt will get finished and auctioned off in January.  I'll try to get a picture of it and post the completed quilt for you.

FINALLY, on October 1st, I got the device to inject my Enbrel medicine.  Fortunately, their nurse was in Ventura county and came out that afternoon and showed me how to do it.   So every Monday I give myself the injection.  I've had 3 at this point.  So far so good.  No side effects yet.  Hands are still slightly swollen as are my feet and ankles.  They've been that way since the end of February so it seems normal at this point.  The cost is enough to make you sick.  The first month's supply was just over $1500.  The second was to be less, but it's the end of the year, so I hit what they call the "donut hole" or MediGap.  Where you have to pain 35% of the drug cost rather than your lower insurance rate.  So November's co-pay will be something I don't want to think about right now.  Good news is it will put me into the 3rd phase of insurance which is called "catastrophic coverage" and my last month's dosages will only cost about $10.  Don't like the fact that I'm being classified with a "catastrophic illness", but what can you do.   Get to start this process all over at the beginning of the year.  I read that Congress passed the bill giving back the right of insurance companies to refuse people with "pre-existing" conditions.  At our age who doesn't have one!  So much for finding a better insurance company.  Guess I'm stuck with this one until they change the law AGAIN...if they ever do.

After much debating, I finally excepted Bruce's offer to drive me up to Santa Clara for my annual trip with Selma to the Pacific Int'l Quilt Festival.  Hated making him do it.  But since my hands get sore even after driving around town, didn't think I'd do well driving for 6 hours.  He took me up the Tuesday before and stayed at the Hyatt with me before driving home. 

Selma came the next day and we got our favorite room and had a wonderful time.  Got to visit with my friends Laura Fraga and Mona Wheeler at lunch and dinner on Friday.  Hadn't seen either for such a long time.

Kept forgetting to take my tablet down to the show so I haven't any pictures to share.  Except for this one of our hotel room where we set up our sewing machines.   I did win a $50 certificate at one of the drawings they had.  Bought a Cutterpillar LED light box and cutting board.  They had to mail it to me because they sold out.  Should have it by Saturday so will take a picture and show it to you.

Bruce picked me up on Monday the 15th and we drove up to Hayward and had lunch with our long time friend Marianne.  She was Bruce's boss at several different jobs.  Was so nice catching up.  After lunch we drove down to Salinas and spent the night.  The motel gave us a list of places to go to dinner.  Mostly on the same street.  Turned out they were either closed on Monday's or were out of business.  Thank heaven our new car has a GPS system that locates restaurants for us.

Home on Tuesday and had just a week to get ready for our next trip.  On Monday the 22nd we caravaned with the kids up to Mammoth.   We rented a house our daughter's friend had rented and recommended.  It was a beautiful condo on a golf course.  Had 3 levels.  We had one of the bottom bedrooms with a bath and outdoor hot tub.  Molly got the other room on that level.  She was thrilled to sleep in the top bunk.  Alissa, Nick and Connor shared the master bedroom on the main level.  That's were the kitchen/dining and living room were located.  Had a beautiful stone fireplace that really warmed up the room.  The upper level was more of a loft.  That was Molly's play area.  She had a mini Lego kit to put together and was as happy as a clam up there.  She could "visit" over the rail and not have to worry about Connor getting into all her tiny pieces.

We had great meals, both out and at the house.  Went on a very short hike on the Earthquake Fault trial.  It was great being out in the forest.   The fault opening was too precarious to my liking.  Made me nervous with the kids getting too close to the edges.  Some of the barriers had actually started to erode off the edges.  

Everyone but Connor and I went on another hike around Convict Lake.  They said it was beautiful.   Bruce took me for a drive up to several other lakes the next day.  My favorite was Silver Lake.  What surprised me the most about Mammoth was the lack of pine forest smell.  Yosemite always had such a fragrant pine smell.  Didn't get that here.  

We left on the trip on the 22nd, the anniversary of my father's death.  Hard to believe it's been 34 years.  Came back on the 26th, the anniversary of my mother's birthday.  

The month ended with Halloween.  Bruce handed out candy this year as I had an Endoscope that morning and the anesthetic really did me in for the day.  Don't even remember getting in the car and coming home.  The kids came by with their friends so we got to see them all in costume.  Molly was a princess and Connor was Charlie Brown.  He carried a stuffed Snoopy with him.  

Don't know what's with me this month.  No pictures to share.



Wednesday, October 17, 2018

September 2018

This month is mostly going to be about getting ready for Julie (aka: DeDe) and Kevin's (aka:Gramps) visit on the 15th for 2 weeks.  For those of you who don't know Julie is my sister's youngest daughter and more than just a niece to me.  We are only 9 years apart (my sister and I are (were) 13 1/2 years apart.  Julie came to live with us when she was around 22 and Alissa was just 18 months old.  We became best of friends.  Alissa couldn't pronounce Julie and it came out DeDe.  The name has stuck.  She has her grandkids call her DeDe instead of Grandma.   My sister liked the idea and had her great-grandkids call her GG, for Great Grandmother.  

After they were married they moved back to Ohio to be close to family.  A sad day for me, but understandable.  Kevin is from Buffalo and it made more sense for them to be close to both families.  Anyway.  When DeDe and Kevin both retired they started coming out here for a visit every year.  This is their 3rd visit.  We look forward to it every year.   Since Bruce hates to travel, it's the perfect vacation for us. 

One of the biggest difference between Bruce and myself is that he is a neat freak and I'm... well it's hard to be neat when you have sewing and crafting projects going on ALL the time.  And with my sewing room in the living room, the first room you see when you come into the house, it's been a major problem for him.  Bless his heart, he doesn't complain, but I know it really gets to him.  

At last, I've come up with a great solution.  I emptied two plastic bins recently and now have them on my cutting table.  I was just working on something and when I finished, I put the pieces parts in the bins.  Table is clear, yet my project is right at hand.   Let's just hope I can keep putting things away daily! 

I may have made an error in judgement.  I love cleaning things that are really dirty.  Love to see them shine.  It has bugged me for years that the brass handles on the roll top are all tarnished.  Dad (Bailey) had bought some super polish for his brass coffee table and had told me once he was going to do the handles on the roll top, but never got around to it.  Bruce said he likes the tarnished look.  But I couldn't resist the urge to clean the handles.  I did the one side and now am questioning my decision.  The good news is that they will tarnish again.  The bad news is that the left side ones have tarnished over a 100 years.   What do you think?  Should I do the left ones so they match or just wait  till the right ones tarnish?


Facing the Clock
View from Mirror
Bruce has finally had time to work on his clock for the hall bathroom.   He found a picture he liked and Alissa blew it up and reversed the image.  He then took a clock mechanism and reversed it so it rounds backwards.   Built a frame for the picture/clock, painted it and hung it over the toilet.  When you look at it (picture on the left) you can see it's backwards.  Now look at the picture on the right.  It looks normal.  That's because you're looking at the reflection in the mirror.   He's been talking about doing this for years.  Finally had time to work on it.   Can't wait to find out the reaction when we have guests looking at it for the first time.  :)

My RA doctor decided to put me on Enbrel last month.  Filled out the paper work at my August appointment.  Finally  on Sept. 5th I got the prescription from the  CVS specialty pharmacy.  Trouble is it's just the medicine cartridges and not the device for the injection.  Many, many calls and I still don't have it (Sept 12th).   Had an appointment with the doctor next week and blood work to see how I'm doing on the new medicine.  I moved the appointment to October 4th... hoping I'll get the device soon.    One of the precautions for the medicine is that I can't go to the Ohio Valley.  There's some type of fungus back there.  The Enbrel will shut down my immune system.  The Rheumatoid Arthritis causes your immune system to attack your organs.  So it has to be suppressed.  Being on the Enbrel is also suppose to get me off the Prednisone, which I've been on since March.  Way too long.  

Got so dehydrated from the colonoscopy prep my blood pressure was down to 59/51.  I was ready to pass out.  Bruce took me in an hour early so they could give me an IV to get my blood pressure up.  

All that plus other unidentified health issues that took me to the ER at 4am, have made for a very stressful month.  Guess it's a good thing we don't have any projects going on right now.  Though I really want to feel better for DeDe and Kevin's visit.  Just 3 more days!!!

October 17th
Well guess I didn't get this posted at the end of September!!  

Had a great visit with Julie (aka) and Kevin.  They took 5 days and rented a car to go visit old friends up north.  Spent several days soaking up sunshine at the beach.  Found new places to eat.  Just hung out and visited.  They're so easy to be around; wish we lived closer.  Nick and Alissa had us all over for dinner and a good visit.  The kids just love Kevin; think they feel he's one of them!  Even being as tall as he is!!  I'd post more pictures but I can't get them off my tablet.  

Hopefully I'll be better getting October in at the end of the month!!













Saturday, September 1, 2018

August 2018

Here it is September 1st and I haven't written anything for August.  Usually I write as the month goes on.  

Unfortunately, it was filled with way too much medical stuff.  I'm not having a good year at all!  69 is going out with a bang!  

On to better things.



Bruce got the retaining wall in between the neighbors on the up side and our house.  It had been railroad ties and they were crumbling.  Dotty plants tomatoes along her side of the house and we've been afraid she'll step back and the railroad ties will give and she'll fall.  She's in her 80s.  Turns out the property line was way inside the original wall, so Bruce had to cut the "hill" back quite a ways.  The wall is still on our property, but closer to the line then it was.  Turned out really nice.  We're still debating whether to put a cap on it or not.


This is where I wrote a whole paragraph about our new car.  Then realized we did that in July month.  Think my mind is going.

Also this month, I got my wedding rings back.  They look so beautiful and shiny.  Just like new but better.  From the top they look just like they did before but from the back it's one solid piece.  The rings had been soldered together so it's not that much different.  And the hinge works great.  I had to take them off for my colonoscopy and it was so easy!  I have a little pen that I use to press a dimple on the side and whala!  they just open up.  You can see from the picture that my fingers are still swollen from the RA.  It's nice that I'll be able to remove the rings whenever I need to.

Molly started 1st grade.  She's lost both her front teeth.  Connor is growing into such a cute little toddler.  Life is good!


Thursday, August 2, 2018

July 2018

Flooring is all in the sewing room (aka living room).  Got my longarm rebuilt and the four base cabinets assembled again.  Different location.  Got rid of several storage places so on the 4th, I sit here baffled as to what to do with all the "stuff" that no longer have a home.  Did finally get the beautiful clock Selma made me up on the wall rather than leaning on the wall on top of the roll top.  

The 4th also saw the master bedroom emptied out and our dressers relocated into the guess bed room (aka: Julie and Kevin's room).

Hope you all have more fun on the 4th than we did!

The 6th brought in an unexpected heat wave.  In the hundreds with no ocean breezes to cool us down.   The 7th started out hot but at least with some cool breezes.  Bruce is finishing scraping the master bed room floor.  A crack that runs across the room pushed up and made a ridge.  He chiseled it out and patched it with more cement.  This slab is much more uneven than the one down at the "barn".  

The sewing room is back together - mostly.  I still need a new table to sew on because the one I had turned out to be to narrow so we took it out and moved the roll top down so it isn't stilling out the weird opening in the entry hall.  We also are getting rid of some of the wire shelving which is taking away more storage.  We're only putting back the minimal in each room.

11th saw us moved back into the master bedroom and emptying out the guest bedroom.   We never replaced the center ceiling light with LEDs so on the 12th Bruce bought 4 lights.  And because of this heat wave we've decided to put a ceiling fan in that room.  It gets the hottest out of all the bedrooms.  

Unfortunately the 12th brought on my first "flare" since being diagnosed with RA.  My right hand, fingers and wrist were swollen and painful enough that I ended up taking 800mg of Ibuprofen 3 times over 12 hours.  The 13th the extreme pain was gone and I had more mobility in my fingers.  My wedding ring will not turn at all.  I'm going to have to have it cut off one of these days.  We've tried all sorts of methods to get it off the last few months but the continuous swelling hasn't allowed it to come off.  Doctor upped my prednisone again.  Was finally down to 5mg every other day, now I'm up to 20mg/daily.  Ugh.

13th - Bruce got the wiring done in the attic in the morning.  We're finally getting some ocean breezes which is cooling off the house.  Attic is still plenty hot.  

14th-15th Flooring went in the guest bedroom.  Because it's a click together flooring you can only work from one direction.  It was no problem with the TV room since we had a door on opposite walls.  This room he had to figure a way to reverse the direction.  Came up with a solution that allowed that.  Clever man, my husband.

16th & 17th - moved furniture back into the guest room and started emptying out the office/Molly's room.  Guess I need to call it the kids room now that we have Connor too.  Way too much stuff.  A lot is going OUT.  Trash, garage sale who knows. 

Saw my RA doctor on the 17th too.  She doubled my RA meds (the one that causes diarrhea).  So looking forward to that.  NOT!  Will start weaning off the prednisone next week.  Dropping 5mg a week until I'm back to every other day again.  Have a plan in place for the next flare...in case it happens when I can't get a hold of her.  Next month I'll have a TB test to see if I can take Embril; that is if the insurance will cover it.  Oh the joys of getting old.

18th Bruce started tearing out the carpet and padding in the office.  Got most of the floor scrapped of glue by the end of the day.

20th  Last room has flooring.  YEA!  Tomorrow will see the shoe molding going in and then it's my turn to work.  I get to caulk and paint baseboards.  Not a bad job to do.  Hardest part is putting everything back. Lots of toys to get rid of.

Molly had a little dance recital from the dance camp she attended.  So cute.  She loves to dance.  Connor really has the clapping down.  He loves to clap when everyone else does.

21st  Office/Molly's room is put back together.  Last room finished!  YEA.  But wait!  Why is the living room and dining still full of STUFF?  We only put back what we wanted in each room.  Now we have all this STUFF.  Garage Sale?  ReStore? (donation) Trash?  Very good questions, but what is the answer?

The morning of the 23rd we went to Fox Fine Jewelry downtown and had my rings cut off.  Fussed and stewed over whether to get a new ring in white gold using my original diamonds or stick with my original bands.  In the end I was too sentimental to replace my rings.  There's a new thing called a SuperFit.  It actually hinges
on once side and opens all the way up to look like the letter E (more curvey).  So they're going to add gold to the bands and put in the SuperFit.  I'll finally be able to take the rings off when I help mix mortar!  Get the rings back next month and I'll post pictures of how they work.  I feel naked without my rings on.  Keep trying to twist them, but they're not there!

Spent the 23rd and 24th looking at SUVs.  I know I swore I'd never have one, but Bruce is convinced it will be a better car for me to drive.  Easier to get in and out of and higher up for better visibility.  So on the 25th we bought a dark gray Subaru Forester.  He even opted for the first upgrade and got us more bells and whistles than we know how to use.  It is definitely easy to drive. 

The threshold for the front door got put in.  Bruce is off getting what he needs to put one in between the hall bath and hallway.   Also got some art work up on the walls for the first time since we've been here.  Have had some quilts up but no pictures.  I used to have all Alissa's art work in my sewing room up north.  She drew a picture of me in high school that I love and painted a water color of a naked lady when she was in college.  Two of my favorite pieces.  Got those up; first in my sewing room and the second in the guest bedroom.  Also managed to get up a few of my penguin drawings.   


Even got Mom Bailey's curio out of the master bedroom and back in the family room and the Seth-Thomas clock on top where it belongs.  We had moved it to the bedroom because Molly would run into it and we were afraid the glass front would shatter.   We're going to put something in front of it when Connor is here .  

Bruce had to take down the hanging rail for my quilts in the family room when he redid the sheet rock.  Need to find a new type of hook (he didn't like what we had used before), so I can get my quilts up on the wall.

Next up for me is to find a couch for the family room.  We bought a love seat when we first moved down but I really miss not having a full length couch.

Bruce's next project is to rototill the back yard and the side (north) lawn.  Tear out the rotted railroad tie retaining wall and replace it with a stone wall.  Not going to be more than 3 feet tall, but it does run almost the full length of the property.  He's thinking he can get it done in August before Julie and Kevin get here in September.  I'm tired just typing about it and I won't be doing the work!   We still haven't decided what to do with the back yard, but getting it rototilled will at least get the weeds down.  Think we're going to put in some fruit trees and maybe someday a hot tub.  He did build a privacy wall for the hot tub last year...or was that two years ago???  

Just a bunch or pictures.  Bruce using a scrapper blade on his sawzall to get the glue off the floor.  Think he went through 6 blades.  The fireplace isn't finished, but that can wait till next year.... or winter time.  Haven't found the right tile and style.  We can't agree on white mantle and pillars or wood.




electronics from the TV room
New patio drapes


sewing room stuff in Dining room
More SR stuff in family room


It all came out-should fit back in!
Master done



Guest room done.







August 2nd: Forgot to post this.

Saturday, June 30, 2018

June 2018

The crown molding is up in the family and dining rooms.  Just love the look of crown molding.  

June 5th:  Carpet is coming out of the hall way today.  And the hall closet.  That's a chore because of our 20 banker boxes of "allowed" stuff we brought down with us.  Think it's time to get rid of some of it.  4 boxes are just Christmas stuff.  


Removing carpet includes pulling up all the tack strips around the edge and then patching , with cement, all the holes in the slab from the nails holding the strips down.
  

Flooring is suppose to be at Home Depot tomorrow (6th).  Doesn't mean we'll have it.  They have to hire a truck to deliver it to us.... in the driveway.  Which means we have to move it all into the garage.


Bruce spent sometime over at the kid's helping Nick with the bathroom flooring and getting their new vanity in.  Gives him a break from being on his knees all day here.   Plumbing is next.



June 10th:  FINALLY!  The first boards of the flooring are going down.  The boxes are random lengths which actually makes it harder not to have all the seams line up.  It's 2pm and we're just working on the 3rd 3 foot width of underlayment.   Well it was "we" until Bruce made me come in here to rest.  I lay out the boards so he doesn't need to keep getting up and down.  Unfortunately, bending over trying to choose the right lengths makes me short of breath.  (Yes, I'm seeing doctor's to figure out why.  Part of my heart is enlarged but shouldn't be causing this much of a problem).


End of 1st day of laying flooring, we're just half way across the family room.  After the flooring is down in the room completely, we'll put the baseboards and shoe molding in before we move onto the next room.  As of now, it's family room, dining area, TV room (4th bedroom) then the entry and hall way.

The fireplace is NOT finished.  We're going to get all the flooring done and then do the tile and mantle on the fireplace.  Want to make sure the flooring is down before September when Julie and Kevin get here.

Took us till Tuesday, 12th to finish getting the flooring laid in the family room.  As I type, Bruce is in the garage painting baseboards and the door casing for the garage door.  We never changed it out because we hadn't changed that door.  2nd half of the room went slower.  Had to take out a section because it felt hollow underneath.  Bruce hates that sound, a lot of laminate floors have it.  And even though this isn't a laminate, if it doesn't lay flat there's a problem.  We're using a cork underlayment that doesn't lay perfectly flat for some reason.  By cutting a V out of the "bubble" areas and taping them together, seems to solve some of the problem. 


Base boards and quarter round is in most of the family room.  Can't do the fireplace wall until we get the fire place completed.  Brought in all the flooring from the garage because of the heat; we're afraid the boards will warp.  Furniture is now moved back out of the dining area and into the family room.



June 13th:   Went to Molly's promotion from Kindergarten to 1st grade.  The kids sang some cute lyrics to "You are my Sunshine" and  "Start Spreading the News".  In stead of singing: "New York, New York"  they sang "1st Grade, 1st Grade".  It was cute.  Molly got all the "site word" awards.  Which means she went 2 steps past what was required for reading.  It's wonderful to see how much she loves to read.  We'll be babysitting for her and Connor and notice she's disappeared only to find her in her room reading.  Second picture is with her best friend (and another firefighter kid) Julie.  Molly is one of the tallest and Julie is the shortest.

June 15: Dining area flooring went down.   Bruce had planned on getting the run that goes from the front door through the dining area and on down the hallway the next day.  But it dawned on him as we were sitting in the TV room that the TV room had to be done first.  Have to really plan these things out.  Since there's 2 doors to the TV room he has to start from the family entry through the TV room and go across to the doorway to the hall.  Then he can start the run from the front door down the hallway and meet up with the flooring coming out of the TV room.

Thought I'd throw in a floor plan of the house.  I see that the left side line (wall) somehow got cut off, oh well.   You can see that there's a doorway from the family room into the TV room and then another leaving the TV room going into the hallway.




June 16:  Yea, I got to help!  And I'm not being sarcastic either.  Bruce got the carpet up and then we started to scrap the glue and residue foam padding off the floor.  What a mess.  And because "they" knew "they" were going to lay carpeting down, "they" slopped paint all over the concrete slab.  What a mess.  Did not get it all up today.

One of the big challenges is going to be all the electronic wiring.  Our DirecTV and Ooma phone are all connected to the modem.   There's the DVR, DVD and Roku boxes to deal with too.  Since we didn't want to lose our phone, nor deal with the mess, Bruce just shoved it out of the way as he worked across the room.

You forget all the things you have to deal with along the way when putting down new flooring.  Like replacing the exterior threshold.  The transitions from the tile in the kitchen to the wood; the cork hall bath flooring to the wood.  Then there's the master bath which we haven't remodeled yet.  Who knows what type of flooring we'll be putting in there. 

June 23rd:  Bruce got the entry through the dining area down the hall finished today.  6 doorways and a closet to work around.   Looks so nice!  He's working on grinding out the cement at the front door and making a form to pour new cement.  Smooth cement so that the new threshold will fit nicely into place.  Be so glad when we have the interior done so we can work on the exterior.  Specially the front door.  Bruce is going to put in a stain glass window.  Just add it to the things he needs to do!  Poor guy.

June 27-28:  Emptied out the "sewing room".  The largest room with the heaviest furniture/ equipment in the house.  Took most of the day to take apart the 4 base cabinets that make up my cutting table/storage; the roll top desk and my longarm machine.  Fortunately, we just needed to take the rails off my machine and put furniture movers under one set of legs and push the machine out of the room.  There must of been 40 screws and bolts holding the 4 cabinets and counter tops together.  The roll top comes apart in 5 pieces, that's not counting all the drawers.  All this stuff and other things I have in the room (ironing table, 3 sets of storage cabinets and file cabinet) pretty much filled up the family and dining rooms.   

Pictures  are all the stuff in pieces parts from my sewing room.  You can see in the second picture some of the empty flooring boxes and a stack of 20 more boxes.  We're hoping to be able to return some. 
  
Floor needed a good scraping and one corner of the front wall needed to be repaired with new tape and texture.   Bruce got the crown molding up.  Now all the rooms except the master bath have crown.

June 29th:  Started laying flooring.  By noon he had 8 rows in when we discovered a large dip.  Went to lunch and stewed on it.  Came home and ripped out the floor and found a definite dip in the slab.  Bruce used one of my 3' cutting mats and cut rings out of it and used the under layment tape to  tape them in place to fill the dip.  Flooring is back in and you can walk on the area and not "sink".  It was right at the entry to the room and may just have been where the front right leg of my longarm would fall.  The flooring would surely have cracked under the weight of the machine.

June 29th is the anniversary of my mother passing away.  Hard to believe it's been 31 years.  That's most of my adult life.  

We bought a new curtain rod for the family room and new drapes.  Had to sew 2 panels together for each side.  They still need to be hemmed.  Wanted them to hang for awhile to settle before I cut them off.  Besides, I have no sewing room right now to work on them.  😊  Uh, oh, I just discovered I have emojis I can use.


Sewing room is done except for one length (20') by about 3 feet.  Stopped for lunch and a trip to Home Depot and Lowe's.  By the time we got back didn't feel like changing back into work clothes.  It will get done tomorrow.  Hopefully the wall will be dry enough for paint.   Once Bruce gets the shoe molding on the baseboards, I can putty the nail holes and seams.  A day to dry and then a touch up of paint.  So by Tuesday we should be ready to rebuild my cutting table and move everything back.











Thursday, May 31, 2018

May

May 1st - Bruce got the all clear to go back to work.  Doctor had a hard time finding 2 of the 3 incisions, he was so well healed.  Bruce made it clear that "going back to work" meant lifting 60lb bags of concrete and laying brick.  He knew I'd be mad if he hadn't made that clear to the doctor.  2 weeks.. that's all it took to heal.  Remarkable!

May 1st was also Bruce's 69th birthday.   We went and picked up Chinese take out and had dinner at the kids house.  That's all he wanted.  


Sheet Rock wall
Finished getting drywall up 
Temporary light switch
Drywall around door & Switches
Took down the plastic wall and put up sheet rock instead.  Every time we opened the garage door the wind would pull the plastic out of the staples.  Bruce made a make shift switch for one of the kitchen lights.  Keeping more of the drywall dust out of the rest of the house.  Plus he could get the drywall up around the light switches for the kitchen and the family room.  More taping and sanding!  Worse part about having new drywall.   Molly said she likes the poka dot wall and was disappointed when it got painted and covered up.

We have made umpteen trips to every flooring store from here to Thousand Oaks this month.  Looks great in the store but we get it home and it doesn't look so good.  Went from Swedish Oak to laminate back to Oak.  Throw in a few Jatobas and Maples along the way.  Finally on the 25th, we ordered Brushed Antique Brown Oak flooring from Home Depot.  It was the only place we could find single planks (even in oak) rather than 2 or 3 boards glued together.  Trouble with those was then you have a 2 or 3 board seam that lines up.  My problem is that I loved our solid oak floors in Walnut Creek.  But down here we're on a slab.  Plus the dining room is dark and we felt we needed lighter floors.  This isn't as light as I think Bruce wanted, but I'm happy with it.

The cove molding is up in the family room and being painted for the dining room.  We moved the furniture back out of the dining room so we could tear up the flooring in there and in the entry way.  

My sewing room is still in tack.  Matter of fact, I've just finished quilting the quilt tops I showed you in April.  Needed to get backing fabric and batting.  Plus I threw the timing out on my longarm when I hit a 3/8" acrylic straight edge.  Tried to fix it my self but my eyes aren't as young as they were the last time I had to fix it.  Found a great repair guy that came to the house.  He had to take the bobbin casing home to polish it up from all the nicks so it would stop breaking thread.  Unfortunately, it's still breaking thread when I sew from right to left (normally you sew left to right).  I may have to order new inners.  But that will come after the flooring is done.

Showed Molly how to use my little sewing machine.  She put together this quilt top for her doll baby, Nicole.  I quilted it and asked her if she wanted to learn how to hand sew the binding or if I should do it.  She said she wanted to learn.  So proud of her.

Half of old wood floor up -dining area
Got the old oak flooring up from the dining area.  Lots of glue on the concrete.  We spent a day with chisels and hammers chipping away at the glue.  Memorial Day morning Bruce went and bought 2 Scrapper blades for his Sawzall.  Zip, zip in 5 minutes he had done as much as the two of us had done the day before!  Trouble is it takes a toll on his knees and back.  So he stopped and started attacking the tile in the entry.    You can tell my the type of glue where they had linoleum verses carpet verses wood from the original build.


Old tile Entry
As I'm typing this, Bruce just broke the blade in the Sawzall.  There's a small piece he can't get out.  



So glad to get rid of the old tile entry.  While chiseling it out we discovered they had linoleum squares from where the half wall is to the door.  Just as with the family linoleum floor, we're leaving it down and covering over it.  He'll just use some cement and smooth over the transition from linoleum to cement floor.  We did that up at the "barn" and it worked just fine.  All in all we've gone through 6 blades.  The metal is narrow where it fits in the Sawzall and it fatigues and breaks.

May 30th saw the end of the scrapping and chiseling.  The house is covered with a layer of dust.  Can't cook until I totally wipe down every surface before using it.  Have a plastic bag over my wood knife block to keep the dust off.

Saw my RA doctor yesterday.  The original medicine she put me on caused congestion in my lungs so after 6 weeks I had to stop taking them.  Glad cause they really made me depressed (another side effect).  So today I started a new drug.  I was hoping not to take any, but apparently RA can cause heart, lung, liver and kidney problems if you don't keep it in check.  It's not just about sore and swollen joints.  Hoping no side effects with this one, cause I'd like to get off the prednisone.  Hands are still swollen but not bad and not painful.  Feet hurt worse than the hands right now.  Signing up for membership at the PT place I've gone to before.  They have a heat pool and exercise equipment.  Just have to make myself go.  There is just so many other things that come up that seem more important.

Flooring should be here on June 6th.  We'll bring enough boxes in the house to accumulate for the two rooms and leave the rest in the garage.  Guess my car will have to live outside for awhile.   

I finally got my ribbon for the Penguin quilt.  Just in time for the guild historian to take a picture of it tomorrow.
Close up