Saturday, June 30, 2018

June 2018

The crown molding is up in the family and dining rooms.  Just love the look of crown molding.  

June 5th:  Carpet is coming out of the hall way today.  And the hall closet.  That's a chore because of our 20 banker boxes of "allowed" stuff we brought down with us.  Think it's time to get rid of some of it.  4 boxes are just Christmas stuff.  


Removing carpet includes pulling up all the tack strips around the edge and then patching , with cement, all the holes in the slab from the nails holding the strips down.
  

Flooring is suppose to be at Home Depot tomorrow (6th).  Doesn't mean we'll have it.  They have to hire a truck to deliver it to us.... in the driveway.  Which means we have to move it all into the garage.


Bruce spent sometime over at the kid's helping Nick with the bathroom flooring and getting their new vanity in.  Gives him a break from being on his knees all day here.   Plumbing is next.



June 10th:  FINALLY!  The first boards of the flooring are going down.  The boxes are random lengths which actually makes it harder not to have all the seams line up.  It's 2pm and we're just working on the 3rd 3 foot width of underlayment.   Well it was "we" until Bruce made me come in here to rest.  I lay out the boards so he doesn't need to keep getting up and down.  Unfortunately, bending over trying to choose the right lengths makes me short of breath.  (Yes, I'm seeing doctor's to figure out why.  Part of my heart is enlarged but shouldn't be causing this much of a problem).


End of 1st day of laying flooring, we're just half way across the family room.  After the flooring is down in the room completely, we'll put the baseboards and shoe molding in before we move onto the next room.  As of now, it's family room, dining area, TV room (4th bedroom) then the entry and hall way.

The fireplace is NOT finished.  We're going to get all the flooring done and then do the tile and mantle on the fireplace.  Want to make sure the flooring is down before September when Julie and Kevin get here.

Took us till Tuesday, 12th to finish getting the flooring laid in the family room.  As I type, Bruce is in the garage painting baseboards and the door casing for the garage door.  We never changed it out because we hadn't changed that door.  2nd half of the room went slower.  Had to take out a section because it felt hollow underneath.  Bruce hates that sound, a lot of laminate floors have it.  And even though this isn't a laminate, if it doesn't lay flat there's a problem.  We're using a cork underlayment that doesn't lay perfectly flat for some reason.  By cutting a V out of the "bubble" areas and taping them together, seems to solve some of the problem. 


Base boards and quarter round is in most of the family room.  Can't do the fireplace wall until we get the fire place completed.  Brought in all the flooring from the garage because of the heat; we're afraid the boards will warp.  Furniture is now moved back out of the dining area and into the family room.



June 13th:   Went to Molly's promotion from Kindergarten to 1st grade.  The kids sang some cute lyrics to "You are my Sunshine" and  "Start Spreading the News".  In stead of singing: "New York, New York"  they sang "1st Grade, 1st Grade".  It was cute.  Molly got all the "site word" awards.  Which means she went 2 steps past what was required for reading.  It's wonderful to see how much she loves to read.  We'll be babysitting for her and Connor and notice she's disappeared only to find her in her room reading.  Second picture is with her best friend (and another firefighter kid) Julie.  Molly is one of the tallest and Julie is the shortest.

June 15: Dining area flooring went down.   Bruce had planned on getting the run that goes from the front door through the dining area and on down the hallway the next day.  But it dawned on him as we were sitting in the TV room that the TV room had to be done first.  Have to really plan these things out.  Since there's 2 doors to the TV room he has to start from the family entry through the TV room and go across to the doorway to the hall.  Then he can start the run from the front door down the hallway and meet up with the flooring coming out of the TV room.

Thought I'd throw in a floor plan of the house.  I see that the left side line (wall) somehow got cut off, oh well.   You can see that there's a doorway from the family room into the TV room and then another leaving the TV room going into the hallway.




June 16:  Yea, I got to help!  And I'm not being sarcastic either.  Bruce got the carpet up and then we started to scrap the glue and residue foam padding off the floor.  What a mess.  And because "they" knew "they" were going to lay carpeting down, "they" slopped paint all over the concrete slab.  What a mess.  Did not get it all up today.

One of the big challenges is going to be all the electronic wiring.  Our DirecTV and Ooma phone are all connected to the modem.   There's the DVR, DVD and Roku boxes to deal with too.  Since we didn't want to lose our phone, nor deal with the mess, Bruce just shoved it out of the way as he worked across the room.

You forget all the things you have to deal with along the way when putting down new flooring.  Like replacing the exterior threshold.  The transitions from the tile in the kitchen to the wood; the cork hall bath flooring to the wood.  Then there's the master bath which we haven't remodeled yet.  Who knows what type of flooring we'll be putting in there. 

June 23rd:  Bruce got the entry through the dining area down the hall finished today.  6 doorways and a closet to work around.   Looks so nice!  He's working on grinding out the cement at the front door and making a form to pour new cement.  Smooth cement so that the new threshold will fit nicely into place.  Be so glad when we have the interior done so we can work on the exterior.  Specially the front door.  Bruce is going to put in a stain glass window.  Just add it to the things he needs to do!  Poor guy.

June 27-28:  Emptied out the "sewing room".  The largest room with the heaviest furniture/ equipment in the house.  Took most of the day to take apart the 4 base cabinets that make up my cutting table/storage; the roll top desk and my longarm machine.  Fortunately, we just needed to take the rails off my machine and put furniture movers under one set of legs and push the machine out of the room.  There must of been 40 screws and bolts holding the 4 cabinets and counter tops together.  The roll top comes apart in 5 pieces, that's not counting all the drawers.  All this stuff and other things I have in the room (ironing table, 3 sets of storage cabinets and file cabinet) pretty much filled up the family and dining rooms.   

Pictures  are all the stuff in pieces parts from my sewing room.  You can see in the second picture some of the empty flooring boxes and a stack of 20 more boxes.  We're hoping to be able to return some. 
  
Floor needed a good scraping and one corner of the front wall needed to be repaired with new tape and texture.   Bruce got the crown molding up.  Now all the rooms except the master bath have crown.

June 29th:  Started laying flooring.  By noon he had 8 rows in when we discovered a large dip.  Went to lunch and stewed on it.  Came home and ripped out the floor and found a definite dip in the slab.  Bruce used one of my 3' cutting mats and cut rings out of it and used the under layment tape to  tape them in place to fill the dip.  Flooring is back in and you can walk on the area and not "sink".  It was right at the entry to the room and may just have been where the front right leg of my longarm would fall.  The flooring would surely have cracked under the weight of the machine.

June 29th is the anniversary of my mother passing away.  Hard to believe it's been 31 years.  That's most of my adult life.  

We bought a new curtain rod for the family room and new drapes.  Had to sew 2 panels together for each side.  They still need to be hemmed.  Wanted them to hang for awhile to settle before I cut them off.  Besides, I have no sewing room right now to work on them.  😊  Uh, oh, I just discovered I have emojis I can use.


Sewing room is done except for one length (20') by about 3 feet.  Stopped for lunch and a trip to Home Depot and Lowe's.  By the time we got back didn't feel like changing back into work clothes.  It will get done tomorrow.  Hopefully the wall will be dry enough for paint.   Once Bruce gets the shoe molding on the baseboards, I can putty the nail holes and seams.  A day to dry and then a touch up of paint.  So by Tuesday we should be ready to rebuild my cutting table and move everything back.











Thursday, May 31, 2018

May

May 1st - Bruce got the all clear to go back to work.  Doctor had a hard time finding 2 of the 3 incisions, he was so well healed.  Bruce made it clear that "going back to work" meant lifting 60lb bags of concrete and laying brick.  He knew I'd be mad if he hadn't made that clear to the doctor.  2 weeks.. that's all it took to heal.  Remarkable!

May 1st was also Bruce's 69th birthday.   We went and picked up Chinese take out and had dinner at the kids house.  That's all he wanted.  


Sheet Rock wall
Finished getting drywall up 
Temporary light switch
Drywall around door & Switches
Took down the plastic wall and put up sheet rock instead.  Every time we opened the garage door the wind would pull the plastic out of the staples.  Bruce made a make shift switch for one of the kitchen lights.  Keeping more of the drywall dust out of the rest of the house.  Plus he could get the drywall up around the light switches for the kitchen and the family room.  More taping and sanding!  Worse part about having new drywall.   Molly said she likes the poka dot wall and was disappointed when it got painted and covered up.

We have made umpteen trips to every flooring store from here to Thousand Oaks this month.  Looks great in the store but we get it home and it doesn't look so good.  Went from Swedish Oak to laminate back to Oak.  Throw in a few Jatobas and Maples along the way.  Finally on the 25th, we ordered Brushed Antique Brown Oak flooring from Home Depot.  It was the only place we could find single planks (even in oak) rather than 2 or 3 boards glued together.  Trouble with those was then you have a 2 or 3 board seam that lines up.  My problem is that I loved our solid oak floors in Walnut Creek.  But down here we're on a slab.  Plus the dining room is dark and we felt we needed lighter floors.  This isn't as light as I think Bruce wanted, but I'm happy with it.

The cove molding is up in the family room and being painted for the dining room.  We moved the furniture back out of the dining room so we could tear up the flooring in there and in the entry way.  

My sewing room is still in tack.  Matter of fact, I've just finished quilting the quilt tops I showed you in April.  Needed to get backing fabric and batting.  Plus I threw the timing out on my longarm when I hit a 3/8" acrylic straight edge.  Tried to fix it my self but my eyes aren't as young as they were the last time I had to fix it.  Found a great repair guy that came to the house.  He had to take the bobbin casing home to polish it up from all the nicks so it would stop breaking thread.  Unfortunately, it's still breaking thread when I sew from right to left (normally you sew left to right).  I may have to order new inners.  But that will come after the flooring is done.

Showed Molly how to use my little sewing machine.  She put together this quilt top for her doll baby, Nicole.  I quilted it and asked her if she wanted to learn how to hand sew the binding or if I should do it.  She said she wanted to learn.  So proud of her.

Half of old wood floor up -dining area
Got the old oak flooring up from the dining area.  Lots of glue on the concrete.  We spent a day with chisels and hammers chipping away at the glue.  Memorial Day morning Bruce went and bought 2 Scrapper blades for his Sawzall.  Zip, zip in 5 minutes he had done as much as the two of us had done the day before!  Trouble is it takes a toll on his knees and back.  So he stopped and started attacking the tile in the entry.    You can tell my the type of glue where they had linoleum verses carpet verses wood from the original build.


Old tile Entry
As I'm typing this, Bruce just broke the blade in the Sawzall.  There's a small piece he can't get out.  



So glad to get rid of the old tile entry.  While chiseling it out we discovered they had linoleum squares from where the half wall is to the door.  Just as with the family linoleum floor, we're leaving it down and covering over it.  He'll just use some cement and smooth over the transition from linoleum to cement floor.  We did that up at the "barn" and it worked just fine.  All in all we've gone through 6 blades.  The metal is narrow where it fits in the Sawzall and it fatigues and breaks.

May 30th saw the end of the scrapping and chiseling.  The house is covered with a layer of dust.  Can't cook until I totally wipe down every surface before using it.  Have a plastic bag over my wood knife block to keep the dust off.

Saw my RA doctor yesterday.  The original medicine she put me on caused congestion in my lungs so after 6 weeks I had to stop taking them.  Glad cause they really made me depressed (another side effect).  So today I started a new drug.  I was hoping not to take any, but apparently RA can cause heart, lung, liver and kidney problems if you don't keep it in check.  It's not just about sore and swollen joints.  Hoping no side effects with this one, cause I'd like to get off the prednisone.  Hands are still swollen but not bad and not painful.  Feet hurt worse than the hands right now.  Signing up for membership at the PT place I've gone to before.  They have a heat pool and exercise equipment.  Just have to make myself go.  There is just so many other things that come up that seem more important.

Flooring should be here on June 6th.  We'll bring enough boxes in the house to accumulate for the two rooms and leave the rest in the garage.  Guess my car will have to live outside for awhile.   

I finally got my ribbon for the Penguin quilt.  Just in time for the guild historian to take a picture of it tomorrow.
Close up








Monday, April 30, 2018

April 2018

I see that the email notice you get for my blog shows the contents of the blog, but not in the nice way that the actual website shows it.  Think it's easier to read from the website than the email -FYI.

Side bricks rebuilt
Cement instead of bricks
Where to begin this month?  I think I told you the hardest part was going to be selecting the tile for the front of the fireplace.  I'm sure Bruce would disagree at this point.  Figuring out how to get the first 2 rows of bricks back in after they had fallen out was a real challenge.  But my genius husband always comes up with brilliant ideas.  He built a form and made it all out of cement.  Days have been spent getting the brick relaid around the front of the entire fireplace.  Almost finished....then a set back....more on that later.


Temporary opening to garage
Along the way, waiting for mortar to dry, he did get all the insulation in and most of the sheet rock back up.  If you recall, the door to the garage is on the "clean" side of our plastic wall.  He made an opening into the garage on the "work" side.   Well the plastic wall needs to be moved in order to close up the hole, plus to finish up sheet rocking the rest of the wall where new light switches are.  Then there's the ceiling taping and "mudding" to do. 



Door out to garage/lights for kitchen
One of the main reasons we didn't close off the entire room to begin with is that the kitchen lights are on the wall next to the garage door.  Once we move the wall we will no longer be able to turn on the kitchen lights without going out the front door, in through the outside garage door, back into the house on the work side of the plastic wall.  I say we just eat every meal out but I don't think that's a great solution.  Maybe just dinner...when it's dark in the kitchen. :)

While Bruce malls over how to handle this next step, he's helping Nick demo their guest bathroom.   Everyone down here seems to set the tiles in about an inch or two of cement.  Not making demo as easy as it should be.  Because of that, I'm wondering if I'll ever get our master bath done.  Anyway, they got most of it demoed the first day.  The tub was cast iron and a real bear to remove.  That was Sunday the 15th.  Nick went back to work on Monday and they were to start again on Tuesday the 17th.

I've begun writing this on April 18th, at 3am.  Yesterday (17th) we all had a busy day planned.  Lots of different appointments, juggling kids schedules and the rest of the demo.  Unfortunately, at 3am Bruce woke up with sharp pains in his abdomen.  At 6:30 I took him to the ER.  After a CT scan it was determined he had appendicitis.  There were only 2 of us in the ER waiting room when we got there, so we got a bed right away.  Within a few hours the place was so busy, his bed was moved to the hall way.  There were several ER surgeries ahead of him.  Since his appendix hadn't ruptured (thank goodness), he was low on priority.  Alissa came down to visit while he was waiting for surgery.  Fortunately, he was not in any pain.  The surgery was at 6:30 last night.  I waited until he was back to his room; couldn't go home without seeing him.  Surgery went fine and easy.  I was home at 10:15.  A very long day.

Needless to say, he won't be working on the bathroom or our family room for 6 weeks.  We had lots of time to talk yesterday.  His plan was to clean up the family room of all the work stuff, take down the wall and put the furniture back.  Start up again when he was able to work again.  His thinking was we'd have the dining room back (it's piled with furniture.) 

There's a few flaws in his plan.  Number 1 being that he can't move anything heavier than 5lbs.  Don't know how he thought he'd be moving and cleaning up.  I can do some of it.  But why, move all those bricks out and the furniture back when we will just need to move it all out again?  

I'll complete this at the end of the month and let you know where we are.

Here it is the end of April.  Tomorrow he goes to see the surgeon for his 2 week follow up.  Two week recovery seems to be enough for him...be interesting to hear what the doctor thinks!  

Right now he's scrapping the carpet glue off the floor in the family room.  The original flooring was linoleum tiles.  No need to take them up.  It was the same linoleum we ran into down at the other house.  He did take the plastic wall down but hasn't rebuilt one.  For the most part he's been taking it easy and it's driving him crazy.  He's expecting to get the "all clear" to get back to work tomorrow.  We'll see.

Meanwhile he's been over helping Nick as much as possible with their bathroom remodel. 

Here's a few pictures of a few of the Thomas Fire quilts I've made this month.  The mostly plain one (1) was a challenge from our Ventura Modern Quilt guild.  They had bagged (brown paper bag so we couldn't see) up fabric for each of us to take home and make something out of.  It was called the "Good, Bad and Ugly" challenge.  All fabric donated to the fire quilts.  My first attempt at a "modern" style quilt.  Quilt (2) was donated blocks.  Quilt (3) I took all the donated blocks that didn't measure 12 1/2 and added stripped blocks made out of the "Good, Bad and Ugly" fabric.  Think my only really "ugly" fabric was the blue one which is actually long horn cow heads.

Quilt 1

Quilt 2


I'm hoping to get the tables stacked behind my longarm moved so I can quilt the #1 quilt myself.  They need quilters more than piecers.






Quilt 3




Monday, April 2, 2018

March 2018 - Fireplace Removal Plus

Going to try to post at the end of each month.  

Our T-shirt
Don't think I finished up February. 


Pat(r) received my Quilt
I belong to the Ventura Modern Quilt Guild.  We're heading up the Thomas Fire Quilt Project.  Between January and February I made 2 Quilt tops, a dozen or so blocks and quilted 8 quilts for them.  The purple quilt is one I pieced over 20 years ago but never quilted.  I quilted feathers all over it and turned it in at the March meeting.  Later in this post you'll see I have to give myself a rest from using the longarm machine so have focused on making tops instead.  I know they need quilters more than piecers so am hoping to get back to quilting soon.  I put together blocks that one of my friends from DVQ (in Danville) had made.  Stephanie was fighting cancer the entire time that I knew her.  Each of us got a few of her UFO (UnFinished Objects) when she passed away.  Needed to make one more block to finish off this top.  Have another project that she only had pieces parts made.  Hoping to have it done by the April 9th meeting.   
Stephanie's Top
Selma came down for a week's visit.  She rode down on the Megabus which stops in Burbank.  Worked out great.  We spent the week doing hand sewing and going to quilt stores.  Took her to my small group on Thursday morning.  On Friday we drove to Pasadena to go to Quiltcon.  It was the farthest I've driven south since we moved here.  I have no problem making the trip up north but venturing down towards LA really bothers me.

Anyway we saw a great quilt show and had dinner with a lot of our DVQ friends from the bay area that had also come for the show.  Spent the night and came home Saturday morning.  

Unfortunately the week before my hands had swollen up.  Good news is that they were taking turns, left then right then left again.  The doctor had upped my inflammation meds but they weren't doing the job.

After Selma left I went to see the doctor who did blood work that indicated I had Rheumatoid arthritis.  (RA)  The Rheumatoid Factor is normally 14 or below, mine was 355.   By the time I saw the specialist both hands were swollen and painful to the point I was in tears. She ordered 21 x-rays taken. She also put me on Prednisone and in 2 days the swelling and  most of the pain was gone.  Went back for a followup on the 26th and got some good news.  Seems that so far there's been little damage done to my joints.  Deformation of the joints of my left foot and my left wrist only.  Tomorrow (3/27) I'll start the medicine which is a chemo-therapy pill.  May lose some of my hair.  Go back in April for follow-up.  Staying off the longarm for awhile; seems to aggravate my shoulders and hands (gripping the handles).


Bruce has put up a temporary wall between the living room and the dining room to keep the dust contained.  He tore out of the fireplace.  Then he took down the 3 exterior walls (one of those is the wall to the garage).  He's made 4 trips to the dump with all the rumble.  Molly got to go on the first trip.  Don't think she liked it much.   It's easier to do the wiring without the walls, besides we want to insulate them.  Older homes down here don't have insulation.  But with the weather getting colder each year, we're trying to get the exterior walls fixed.  

March 30th -  The 6 LED ceiling lights he had put in when we first moved down have now been separated into two switches.  4 on one switch and 2 on another.  That way we can just turn on the two right near the garage door when we go out in the evening.  It will shine enough into the kitchen that it will look like we're home.  Though most nights all lights are off except the one bedroom that we use as a TV room and it can't be seen from the front. 

The hardest part of this project is going to be selecting a tile or stone for the fireplace.  Thinking I'll let him decide since I got the say in the kitchen.

March 31st -   Happy almost Easter!  Well it was for us.  Had a brunch and Easter egg hunt at Alissa and Nick's.  So much fun watching the little ones having a great time.  Made this cute little bear for Alissa.  I know it should have gone to one of the grandchildren, but I bought the fur in 1990 to make it for her and never did.  In my cleaning out of my sewing room I came across it and instead of throwing it away, decided to make it.  

Ending the post with a picture of my penguin quilt.   Selma gave me the kit years ago.  When I joined a hand applique group down here I started working on it.  Just this past December I  finally quilted it.  It will be in the Camarillo Quilt show in April.



Friday, March 2, 2018

New Year 2018

August was my last post??!!  Not very good at this anymore, am I?

I'm sure most of you that read this know about the Thomas Fire.  It started on December 4th in Santa Paula.  We are on the border of Santa Paula and the east end of Ventura.  That first night was very scary for our families.  I was so glad that Nick was off duty that day so Alissa and the kids weren't alone.

View from driveway
Bruce and I stood in the driveway or the middle of the street watching the glow of the fire behind the hill.  And were still watching as the flames came down our side heading for the orchard that lay between us.  We stood out there until 3am.  We had packed suitcases and sewing machines.  Alissa and Nick had done the same.  Both men would walk up the block to Foothill (each on his side of the subdivision) checking to see the progress of the fire more closely.  

Flame cresting the hill
Most of the older neighbors packed up and left.  The rest came by to chat for awhile; always with a watchful eye up the street.  Our next door neighbor between us and the "barn" is basically deaf without her hearing aids.  Bruce wanted to be out side if the word came for us to evacuate.  Wanted to be able to flag down the police or firefighter to have them break into Pat's house and get her out.  She slept through all the "excitement".  But after finding out what had gone on, she had a key made and gave it to us.

Newell and Bruce
The winds were so strong.  Trees along the barranca (dividing our side from Alissa's) came crashing down closing off the main street into our side of the subdivision.  Our neighbor's tree broke a large limb and landed on their other neighbors driveway blocking them in.  Bruce took his limb saw over and cut enough off so they could get their cars out.  Had to wait for tree service guys to get the large limb cut safely off.


Sun set 12/5/18
Molly's birthday was the next day 12/5/18.  She turned 6.  The previous weekend we had a family celebration.  Alissa had made fun snacks for her to take to school that Tuesday, but school was canceled.   The kids were actually out of school from the 5th until January 8th.  Between the smokey air and the Christmas Holiday the county shut down the schools for the month.

Our power had been out the first night of the fire but had come back on.  Alissa's and Nick's were still out the next day (5th).  So they brought food over and spent the day.   For Molly it was a fun celebration of her birthday while us grown ups were just relieved that the Santa Ana winds had blown the fire past our homes.

As the days went by it was unbelievable the destruction that had/was happening to our little town and then on up the coast to Carpinteria, Montecito and parts of Santa Barbara.  Everyone knew someone who was affected.  We could only drive on Foothill for a block before it was barricaded and guarded by the National Guard.  Very strange site to see.  It was so sad to hear about the looting that was going on.  Bad enough to loose your home or part of your home, then have to worry about being robbed.

On a happier note, Julie and Kevin came out from Ohio to spend the Christmas holidays with us.  I was glad that the air had cleared in our part of town.   The weather was warm enough that we could spend time down at the beach.  So happy they are making a yearly visit to vacation with us.  Looking forward to the next visit!  

Had Christmas on the Thursday before Christmas.  Nick had 2 days off in a row and it was the first time in years he got to watch Molly's surprised face "Christmas" morning.  It was a wonderful day and so much to be grateful for.

Alissa took Molly and Connor to see Santa the following Saturday.  She thanked Santa for coming early because Daddy was a firefighter.  The wonderful man played right along and asked Molly what her favorite present was.  

January 29th was our 47th wedding anniversary.  We celebrated with a dinner out.  I was still recovering from flu.  Bruce had it and then I got it.  Was so dehydrated that I passed out. Ended up spending 5 hours in the ER being pumped full of fluids.

I skipped over the other December news.  We sold the "Barn"!   People came to see it as soon as it hit the MLS.  Had an offer that day.  Turned it down because we wanted to wait for the broker open house on Thursday and general open house that first weekend.  The people wanted it so badly that they offered us more not to have the open house.  After a minor termite repair and add GFI breakers in the kitchen, it was a done deal.  The wife is a interior designer and loved our color choices.  (Thank you very much, Alissa!)   By December 20th the house was no longer ours.

Nice to have it done, but Bruce is now wondering around the house like a lost puppy!  Too cold to do the needed projects outside.  Not much better inside.  We're starting with the hall closet filled with 20 banker boxes.  A few of them still have antiques in them.  Trying to figure out how or where to sell them.  6 have photos.  Others paper work; still have all the stuff left over from both our parents and Bruce's brother Ron.  Taking a trip to have one box we've been through to have it shredded.  One of the best things to come of this is that Bruce is finally ready to get rid of "Esmeralda".  The wood carved goddess his aunt and uncle brought him from India.  He's had it since high school and I've always hated it.  Came to live with us when Dad moved in and it's been on our mantel since we moved to Ventura.

After getting the closet storage reduced, we're going to tackle the family room.  Namely taking out the horrid fireplace and built in floor to ceiling book case.  Hence the need to clear out storage.  Have a lot of stuff on the bookcase.  Once the fireplace is done, we'll start laying the new flooring.  Will be glad to be rid of the carpet.  Biggest problem will be my sewing room (the actual living room).  So much heavy things in here.  The 4' Bankers desk from the old office; my longarm machine and 4 kitchen base cabinets hooked together to make my cutting table and fabric storage.  

I'll try to do better to keep you all up to date.







Tuesday, August 22, 2017

The Barn - Installment 4


Best laid plans......  that covers a lot.  The last time I wrote it was the end of June.  Little did I know that in 11 days we would have a set back in our plans to have the house finished and on the market by end of summer.  

As much as I'd love to go into detail, I'm not at liberty to do so.  I'm married to a very private man and have to honor that.  But as of today, we're back on track, albeit a bit  slower. Still aren't quite up to full strength but getting there.

Since I last wrote we did got the backyard cement jack-hammered.  Thanks to Nick for helping Bruce on the second day.  I did a pretty good job of prying cement blocks out of Bruce's way, but I don't have the strength to move the jack-hammer from spot to spot.  Did manage to drop the 16 pound pry bar across the top of my right foot.  Nothing broken thanks goodness but lovely colors showed up the following days!  

Of course we had really hot weather the first days of July, while Bruce was moving concrete into the dumpsters.  He had one filled and the second one a bit more than half filled when things came to a halt.  Nick and Alissa came over and I babysat while they finished filling the second dumpster.  That was taken away.  We still have a 3rd one to fill, but it's still on hold for the time being.

Last week we starting to lay the flooring.  Well Bruce does most the work, I just layout the planks and do the running to get stuff so he doesn't have to get up and down.   We're finished except for the family room.  Didn't think things through very well.  We've been moving the refrigerator around and it's ended up in the family room.  Trouble is it doesn't fit through the door to the garage.  And since the patio is still rubble, can't go out that way. Need to take it out the front door.  Hoping we don't mark up the flooring in the process.

Bruce was working on getting the front threshold reworked now that the flooring is down, today.  I took the day off to play with the girls and Conner ... well go shopping with them.

Can't believe tomorrow our little Molly starts Kindergarten.   She's very excited.

The Barn
In case you're interested, here is a layout of the Barn. Basically the same layout out as our house but with minor difference in the kitchen and master bath.  Plus we added a door from the 4th bedroom into the family room in our house.

         

Tuesday, June 27, 2017

The Barn - Installment 3

Where does the time go when you're having fun???  Oh my, it's been almost a year since I last posted and a year and 7 days since we started working on this house.

Where ever to begin?  

Most important thing first!  We have a wonderful new addition to our family.  Conner Daniel Strouse.  Born February 8, 2017.  He is such a sweetie.  Never seen a baby that smiles as much as he does!  Molly is totally in love with him and vice versa.  He grins and giggles every time he hears her voice.

Don't believe that the previous owners EVER had the house tented for termites in the 50 years they lived there.  It was tented during escrow when we bought it in 2015. 

Every time we needed to open up a wall or ceiling we discovered severe termite damage. Bruce wasn't sure what was holding up the kitchen ceiling.   Beams and studs have been replaced throughout the house.

All the new windows got put in and trimmed out.  Sold all the wrong sized ones on Craig's list.  Love Craig's list.  Sold 3 sets of mirrored closet doors too.

Hall bath was taken down to studs.  Put in a new tub and a beautiful subway white tile surround with a black and gray accent strip.  New white vanity and black/gray granite counter top.  New tile flooring...same as the kitchen.

Oh, yea the kitchen!  It's beautiful; not as beautiful as my new one, but I think anyone will be pleased with it.  We bought Ikea cabinets in gray. Over 100 boxes were delivered! Everything had to be assembled.  But once you do one cabinet, you can figure out the rest. Same with the drawers.  Actually enjoyed putting them together. The upper corners have built in lazy Susan's as do the lower corners. Bought LG stove, microwave and a Kitchenaid dishwasher. Since Bruce doesn't want me to share pictures yet, here's a picture from Ikea's website of the cabinets we used.

Had to refigure the master bathroom.  It had/has a massive shower in the same gray tile that was on the floor in the old kitchen.  Our realtor convinced us that we didn't need to redo it.  Still need to repaint the ceiling "in" the shower and clean the grout.  But they had a tiny little corner sink with basically no counter space. and a closet rod for cloths.  No door on the bathroom.  Bruce built out a walk-in closet and made room for a normal vanity.  It's only 4 feet, but at least there's room to put something down.   He has decided to make a wood counter top like what we did up north.  That hasn't happened yet.

I've been painting crown moulding and door casings for weeks!  And doors!  8 interior doors (bedrooms, bathrooms, master walk-in closet and door from family room to garage.  Not to mention 10 closet by-pass doors.  Bruce trimmed out all the closets and put up the new tracks today.  The base boards won't get down until the flooring is down.

Since the "barn" is just like our own house, we got to see what it would be like when we rip out the ugly stone fire place and hearth.  What a job that was.  The fire places are not centered on the wall.  The stone work goes from the fireplace all the way across to the side wall, just on one side.  Bruce managed to get all the stone to the dump in just two loads. His truck only holds 1000lbs and one trip was 1200 and the other 1300.  On the second trip there were some young men unloading asphalt.  They were amazed that he was still "working concrete" at his age.  Aren't we all?  

The new fireplace is stacked sandstone.   No raised hearth for a more modern look.  We haven't picked out the hearth stone yet because we need to match it up with the flooring. (Which arrives tomorrow).   He made a beautiful mantle for it and I've painted it white.  By the way, all the walls are painted a light gray/taupey color called Campfire Ash.  Alissa picked it out and I love it.  The picture I'm showing you of the tile we bought at Home Depot has a black and white mosaic tile above it.  It's very similar to the one we put in the hall bath. On my computer the "Stone Grey" tile looks pinkish, but there's no pink in it.  Just shades of gray.  Looked it up, America's spell it gray and the English spell it grey.

We've painted the 2 exterior walls around the patio, the back of the house and one side. Not painting the side that gets no sun.  The front we'll do a bit later.  We could use the sprayer on the stucco, but the front is wood and has too much trim so it will be easier to paint.  Think Bruce is up pressure washing the gables as I write this.  There's a massive overhang over the patio that he had to roll with a little paint roller.  Took days.

Like I said the flooring arrives tomorrow.  Not going to put it in until the patio and other cement is jack hammered and the new pavers are in.  

We still have all that to do plus the front yard is dirt.  He's been testing the sprinkler system and he gets one line repaired when a leak pops up somewhere else.  Seems there's two systems, one on top of another.  Of course it's always the bottom one that needs repairing! Once the system is working he can water the dirt enough to get it rototilled.  Haven't decided on ground cover or sod.  

We're hoping to have it on the market before the end of summer.  But when I start thinking of all that has to be done, I'm not sure if we'll make it.  Figure a week to jack hammer and haul the cement to a dumpster.  Another week to lay sand and pavers.  Then a good 10 days to put down the flooring through out the house.  A week to do the front painting.  Another week or two to do the front yard and back yard.  Plus you have to throw in time to go to Home Depot at least twice a week; decisions on what pavers to put down.  Oh, and window coverings. Once the floors are down then I have to get a house full of baseboards painted and nailed in. Oh, and we haven't worked out what to do with the front door yet.  Not to mention just cleaning up the house and getting all the tools carried back to our house. I'm more tired now than I was when I started typing!

So now you're caught up.  Doesn't sound like a years worth of work, but you'd be amazed at how long things take.  Specially when you add in all the trips to different stores.  Ordering and reordering pieces parts.  

We did take a week off of Thanksgiving and thoroughly enjoyed Julie and Kevin.  Can't wait to have more time to visit with them.  And of course we have Molly at least one day a week. Need to have our Molly "fix" to get us through the rest of the week.